X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684040714000

Well Details

Well ID: 0684040714000
Loading map...
Location: 00/14-07-068-04W4/0
Location Alias: 00/14-07-68-04 W4M
Location Alias 2: 00/14-07-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 07
County/Municipality: Improvement District No. 349
Well Name: CNRL 7A52 PRIMROSE 14-7-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0317151
License Date: 2004-10-20
License Status: Issued
Spud Date: 2005-03-24
Final Drill Date: 2005-04-23
Well Total Depth: 2045.00 m
Surface Hole Latitude: 54.871648
Surface Hole Longitude: -110.581003

For data sources see[1][2]

Well History

Date Event
2004-10-20 Obtained License
2005-03-24 Surface Casing Operation Performed
2005-03-25 Direction Drilling Operation Performed - Horizontal
2005-03-26 Well Log Performed
2005-03-27 Intermediate Casing Operation Performed
2005-04-23 Finished Drilling
2005-04-23 Well Log Performed
2005-04-23 Well Mode changed to Drilled and Cased
2005-04-24 Liner Casing Operation Performed
2005-04-24 Perforation Treatment Performed - Open-Hole Completion
2005-04-24 Perforation Treatment Performed - Slotted Liner or Casing
2005-04-24 Rig Released
2005-11-27 Well Log Performed
2006-04-04 Well Began Production
2006-04-04 Well Fluid changed to Crude Bitumen
2006-04-04 Well Type changed to Cyclical
2006-12-08 Well Log Performed
2007-12-31 Well Log Performed
2008-01-24 Well Log Performed
2008-04-16 Well Log Performed
2010-06-02 Well Log Performed
2011-01-06 Well Log Performed
2019-06-01 Well Fluid changed to Crude Bitumen
2019-06-01 Well Mode changed to Suspended
2019-06-01 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-03-25 158.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-04-24 Slotted Liner 818.00 2037.00 0
2005-04-24 Open Hole/Barefoot Completion 2037.00 2045.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4890 0.0 0.0 0.0
2007 6052 0.0 0.0 0.0
2008 5535 0.0 0.0 0.0
2009 7264 0.0 0.0 0.0
2010 8519 0.0 0.0 0.0
2011 7796 0.0 0.0 0.0
2012 7452 0.0 0.0 0.0
2013 7777 0.0 0.0 0.0
2014 8525 0.0 0.0 0.0
2015 8341 0.0 0.0 0.0
2016 7084 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8137 0.0 0.0 0.0
2019 3057 0.0 0.0 0.0

For data sources see[6]

References