X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684040210002

Well Details

Well ID: 0684040210002
Loading map...
Location: 00/10-02-068-04W4/2
Location Alias: 00/10-02-68-04 W4M
Location Alias 2: 00/10-02-068-04 W4/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 02
County/Municipality: Improvement District No. 349
Well Name: CNRL 3A66 RE PRIMROSE 10-2-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0396918
License Date: 2008-05-27
License Status: Amended
Spud Date: 2013-02-02
Final Drill Date: 2013-02-10
Well Total Depth: 1847.00 m
Surface Hole Latitude: 54.865474
Surface Hole Longitude: -110.513937

For data sources see[1][2]

Well History

Date Event
2008-05-27 Obtained License
2008-09-13 Direction Drilling Operation Performed - Deviate
2008-09-14 Direction Drilling Operation Performed - Horizontal
2013-02-03 Direction Drilling Operation Performed - Horizontal
2013-02-04 Lost Circulation Occurred
2013-02-10 Finished Drilling
2013-02-10 Well Mode changed to Drilled and Cased
2013-02-12 Well Log Performed
2013-02-13 Well Log Performed
2013-02-14 Liner Casing Operation Performed
2013-02-15 Perforation Treatment Performed - Open-Hole Completion
2013-02-15 Perforation Treatment Performed - Slotted Liner or Casing
2013-02-15 Rig Released
2013-03-01 Well Began Production
2013-03-01 Well Fluid changed to Crude Bitumen
2013-03-01 Well Type changed to Cyclical
2013-03-12 Perforation Treatment Performed - Jet Perforation
2013-03-13 Perforation Treatment Performed - Jet Perforation
2013-03-14 Perforation Treatment Performed - Jet Perforation
2017-05-12 Well Log Performed
2019-06-05 Well Log Performed
2019-07-01 Well Fluid changed to Crude Bitumen
2019-07-01 Well Mode changed to Suspended
2019-07-01 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-09-13 170.00 Deviate (5 - 79 degrees)
2008-09-14 623.00 Horizontal
2013-02-03 814.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-15 Slotted Liner 814.00 1499.60 0
2013-03-13 Perforation 1267.20 1268.20 2
2013-03-13 Perforation 1286.20 1287.20 2
2013-03-13 Perforation 1305.20 1306.20 2
2013-03-13 Perforation 1324.30 1325.30 2
2013-03-13 Perforation 1343.30 1344.30 2
2013-03-13 Perforation 1362.30 1363.30 2
2013-03-13 Perforation 1381.30 1382.30 2
2013-03-13 Perforation 1400.30 1401.30 2
2013-03-14 Perforation 1115.10 1116.10 1
2013-03-14 Perforation 1134.10 1135.10 1
2013-02-15 Open Hole/Barefoot Completion 1499.60 1847.00 0
2013-03-14 Perforation 1153.10 1154.10 1
2013-03-14 Perforation 1172.10 1173.10 1
2013-03-14 Perforation 1191.10 1192.10 1
2013-03-14 Perforation 1210.20 1211.20 1
2013-03-12 Perforation 1419.30 1420.30 2
2013-03-12 Perforation 1438.40 1439.40 2
2013-03-12 Perforation 1457.40 1458.40 2
2013-03-12 Perforation 1476.40 1477.40 2
2013-03-12 Perforation 1492.00 1493.00 2
2013-03-13 Perforation 1229.20 1230.20 2
2013-03-13 Perforation 1248.20 1249.20 2

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4399 0.0 0.0 0.0
2014 8230 0.0 0.0 0.0
2015 6298 0.0 0.0 0.0
2016 8777 0.0 0.0 0.0
2017 7266 0.0 0.0 0.0
2018 4486 0.0 0.0 0.0
2019 3613 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-04 Lost Circulation 844.00 925.00
2013-03-16 No Incident Encountered 0.00 0.00

For data sources see[7]

References