X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0676072610000

Well Details

Well ID: 0676072610000
Loading map...
Location: 00/10-26-067-07W6/0
Location Alias: 00/10-26-67-07 W6M
Location Alias 2: 00/10-26-067-07 W6/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 6
Range: 07
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: AMOCO ET AL GOLD CREEK 10-26-67-7
Operator Name: BP Canada Energy Group ULC
License Number: 0077525
License Date: 1979-08-16
License Status: RecCertified
Spud Date: 1979-08-25
Final Drill Date: 1979-12-01
Well Total Depth: 3080.00 m
Surface Hole Latitude: 54.831544
Surface Hole Longitude: -118.949285

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-16 Obtained License
1979-10-26 Drill Stem Test Performed
1979-12-01 Finished Drilling
1979-12-06 Liner Casing Operation Performed
1979-12-07 Well Mode changed to Drilled and Cased
1980-02-05 Perforation Treatment Performed - Jet Perforation
1980-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-16 Perforation Treatment Performed - Fractured
1980-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-05-04 Perforation Treatment Performed - Jet Perforation
1980-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-16 Perforation Treatment Performed - Cement Plug
1997-08-16 Perforation Treatment Performed - Jet Perforation
1997-08-16 Perforation Treatment Performed - Remedial Casing
1997-08-16 Plug Back Performed
1997-08-16 Well Mode changed to Abandoned Zone
1997-08-17 Well Abandoned
1997-08-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-05 Perforation 2971.50 2976.00 13
1997-08-16 Perforation 516.00 517.00 13
1997-08-16 Remedial Casing Cementing 516.00 517.00 0
1997-08-16 Cement Plug 496.00 525.00 0
1980-02-05 Perforation 2979.50 2980.50 13
1980-02-06 Acid Treatment 2971.50 2980.50 0
1980-02-16 Fracture 2971.50 2980.50 0
1980-05-03 Packing Device Capped w/Cement 2967.00 2967.00 0
1980-05-04 Perforation 2633.00 2635.50 13
1980-05-05 Acid Treatment 2633.00 2635.50 0
1980-07-02 Acid Treatment 2633.00 2635.50 0
1997-08-16 Packing Device Capped w/Cement 2598.00 2608.00 0

For data sources see[4]



References