X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0676063205020

Well Details

Well ID: 0676063205020
Loading map...
Location: 02/05-32-067-06W6/0
Location Alias: 02/05-32-67-06 W6M
Location Alias 2: 02/05-32-067-06 W6/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 6
Range: 06
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL 102 HZ GOLDCK 5-32-67-6
Operator Name: Shell Canada Limited
License Number: 0470440
License Date: 2014-10-03
License Status: Amended
Spud Date: 2015-05-29
Final Drill Date: 2015-06-21
Well Total Depth: 5030.00 m
Surface Hole Latitude: 54.863175
Surface Hole Longitude: -118.887603

For data sources see[1][2]

Well History

Date Event
2014-10-03 Obtained License
2015-05-30 Surface Casing Operation Performed
2015-06-01 Direction Drilling Operation Performed - Deviate
2015-06-06 Direction Drilling Operation Performed - Horizontal
2015-06-06 Well Log Performed
2015-06-07 Intermediate Casing Operation Performed
2015-06-21 Finished Drilling
2015-06-21 Well Log Performed
2015-06-21 Well Mode changed to Drilled and Cased
2015-06-22 Well Log Performed
2015-06-23 Liner Casing Operation Performed
2015-06-26 Rig Released
2015-08-04 Perforation Treatment Performed - Open-Hole Completion
2015-08-05 Well Log Performed
2015-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-26 Well Fluid changed to Gas
2015-10-26 Well Mode changed to Testing
2015-11-04 Well Began Production
2015-11-04 Well Fluid changed to Gas
2015-11-04 Well Mode changed to Flowing
2017-06-02 Well Fluid changed to Gas
2017-06-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-29 Precision Drilling Corporation 530 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-06-01 761.10 Deviate (5 - 79 degrees)
2015-06-06 2793.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-04 Open Hole/Barefoot Completion 5015.50 5030.00 0
2015-08-14 Multi-Stage Fracture 4398.60 4399.90 0
2015-08-14 Multi-Stage Fracture 4324.80 4326.00 0
2015-08-14 Multi-Stage Fracture 4237.40 4238.60 0
2015-08-14 Multi-Stage Fracture 4149.60 4150.80 0
2015-08-14 Multi-Stage Fracture 4060.80 4062.00 0
2015-08-14 Multi-Stage Fracture 3972.50 3973.70 0
2015-08-14 Multi-Stage Fracture 3884.20 3885.50 0
2015-08-14 Multi-Stage Fracture 3795.70 3796.90 0
2015-08-14 Multi-Stage Fracture 3707.20 3708.50 0
2015-08-14 Multi-Stage Fracture 3619.60 3620.90 0
2015-08-13 Multi-Stage Fracture 4988.70 4990.20 0
2015-08-14 Multi-Stage Fracture 3559.90 3561.20 0
2015-08-14 Multi-Stage Fracture 3472.60 3473.90 0
2015-08-14 Multi-Stage Fracture 3384.00 3385.30 0
2015-08-15 Multi-Stage Fracture 3296.50 3297.70 0
2015-08-15 Multi-Stage Fracture 3208.60 3209.90 0
2015-08-15 Multi-Stage Fracture 3122.20 3123.50 0
2015-08-15 Multi-Stage Fracture 3038.00 3039.30 0
2015-08-15 Multi-Stage Fracture 2948.00 2949.20 0
2015-08-15 Multi-Stage Fracture 2872.20 2873.50 0
2015-08-13 Multi-Stage Fracture 4913.10 4914.40 0
2015-08-13 Multi-Stage Fracture 4840.80 4842.10 0
2015-08-13 Multi-Stage Fracture 4767.50 4768.80 0
2015-08-13 Multi-Stage Fracture 4693.50 4694.70 0
2015-08-13 Multi-Stage Fracture 4619.10 4620.30 0
2015-08-13 Multi-Stage Fracture 4545.80 4547.00 0
2015-08-14 Multi-Stage Fracture 4471.90 4473.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-13 2015-08-15 2,685 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 87.74 N/A
CERAMIC PROP Halliburton Crystalline silica. cristobalite 14464-46-1 100 0.9519 N/A
Mullite 1302-93-8 100 0.9519 N/A
Silica. amorphous - fumed 7631-86-9 100 0.9519 N/A
SAND - COMMON WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 0.3802 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 10.8978 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0446 N/A
Ethoxylated alcohols 9068 100 0.0446 N/A
Fatty nitrogen derived amides 9068 100 0.0446 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0446 N/A
Inert ingredient(s) Not Available 100 0.0446 N/A
Proprietary ingredient(s) Trade Secret 100 0.0444 N/A
MC S-2730 Halliburton Surfactant Inert ingredient Not Available 100 0.021 N/A
Methyl alcohol 67-56-1 100 0.021 N/A
Phosphonic acid. (((phosphonomethyl)imino)bis(2.1-ethanediy
l
22042-96-2 100 0.021 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-14 2015-08-15 Surface Water - Runoff 2216
2015-08-12 2015-08-16 Surface Water - Runoff 11626

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1368 0.0 0.0 0.0
2016 7015 0.0 0.0 0.0
2017 5936 0.0 0.0 0.0
2018 4789 0.0 0.0 0.0
2019 4292 0.0 0.0 0.0
2020 1583 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-26 No Incident Encountered 0.00 0.00
2015-08-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References