If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675251303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.800123,"lon":-117.673125,"icon":""}]} |
Location: 00/03-13-067-25W5/0 | |
Location Alias: 00/03-13-67-25 W5M | |
Location Alias 2: 00/03-13-067-25 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 25 | |
Section: 13 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ARC HZ ANTEN 3-13-67-25 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0433205 | |
License Date: 2011-04-29 | |
License Status: Issued | |
Spud Date: 2011-06-15 | |
Final Drill Date: 2011-06-25 | |
Well Total Depth: 2851.00 m | |
Surface Hole Latitude: 54.800123 | |
Surface Hole Longitude: -117.673125 |
Date | Event |
---|---|
2011-04-29 | Obtained License |
2011-06-16 | Surface Casing Operation Performed |
2011-06-19 | Direction Drilling Operation Performed - Horizontal |
2011-06-19 | Well Log Performed |
2011-06-21 | Intermediate Casing Operation Performed |
2011-06-22 | Well Log Performed |
2011-06-25 | Finished Drilling |
2011-06-25 | Well Mode changed to Drilled and Cased |
2011-06-26 | Liner Casing Operation Performed |
2011-06-27 | Rig Released |
2011-08-15 | Well Began Production |
2011-08-15 | Well Fluid changed to Crude Oil |
2011-08-15 | Well Mode changed to Flowing |
2011-08-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-18 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-21 | Well Log Performed |
2011-08-24 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-06-19 | 1694.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-18 | Open Hole/Barefoot Completion | 2846.00 | 2851.00 | 0 |
2011-08-18 | Multi-Stage Fracture | 2660.90 | 2850.00 | 0 |
2011-08-18 | Multi-Stage Fracture | 2572.80 | 2659.90 | 0 |
2011-08-18 | Multi-Stage Fracture | 2485.20 | 2571.80 | 0 |
2011-08-18 | Multi-Stage Fracture | 2386.10 | 2484.20 | 0 |
2011-08-18 | Multi-Stage Fracture | 2298.00 | 2385.10 | 0 |
2011-08-18 | Multi-Stage Fracture | 2110.20 | 2197.10 | 0 |
2011-08-18 | Multi-Stage Fracture | 1866.30 | 2109.20 | 0 |
2011-08-18 | Multi-Stage Fracture | 2198.10 | 2298.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1308 | 0.0 | 0.0 | 0.0 |
2012 | 7452 | 0.0 | 0.0 | 0.0 |
2013 | 8315 | 0.0 | 0.0 | 0.0 |
2014 | 7692 | 0.0 | 0.0 | 0.0 |
2015 | 8687 | 0.0 | 0.0 | 0.0 |
2016 | 7847 | 0.0 | 0.0 | 0.0 |
2017 | 7595 | 0.0 | 0.0 | 0.0 |
2018 | 8663 | 0.0 | 0.0 | 0.0 |
2019 | 7979 | 0.0 | 0.0 | 0.0 |
2020 | 936 | 0.0 | 0.0 | 0.0 |
For data sources see[6]