X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675241708000

Well Details

Well ID: 0675241708000
Loading map...
Location: 00/08-17-067-24W5/0
Location Alias: 00/08-17-67-24 W5M
Location Alias 2: 00/08-17-067-24 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 24
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTEN 8-17-67-24
Operator Name: ARC Resources Ltd.
License Number: 0411733
License Date: 2009-08-06
License Status: Issued
Spud Date: 2009-09-20
Final Drill Date: 2009-10-01
Well Total Depth: 3438.50 m
Surface Hole Latitude: 54.787932
Surface Hole Longitude: -117.629190

For data sources see[1][2]

Well History

Date Event
2009-08-06 Obtained License
2009-09-22 Surface Casing Operation Performed
2009-09-25 Direction Drilling Operation Performed - Horizontal
2009-09-27 Intermediate Casing Operation Performed
2009-10-01 Finished Drilling
2009-10-01 Well Log Performed
2009-10-01 Well Mode changed to Drilled and Cased
2009-10-02 Liner Casing Operation Performed
2009-10-03 Rig Released
2009-11-13 Perforation Treatment Performed - Open-Hole Completion
2009-11-13 Well Log Performed
2009-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-19 Perforation Treatment Performed - Open-Hole Completion
2009-12-15 Well Began Production
2009-12-15 Well Fluid changed to Crude Oil
2009-12-15 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-09-25 1644.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-13 Open Hole/Barefoot Completion 1999.00 3438.50 0
2009-11-19 Multi-Stage Fracture 2293.80 2441.90 0
2009-11-19 Multi-Stage Fracture 2156.60 2292.80 0
2009-11-19 Multi-Stage Fracture 2019.00 2155.60 0
2009-11-19 Open Hole/Barefoot Completion 2019.00 3423.00 0
2009-11-19 Multi-Stage Fracture 3286.30 3423.00 0
2009-11-19 Multi-Stage Fracture 3138.90 3285.30 0
2009-11-19 Multi-Stage Fracture 3003.90 3137.90 0
2009-11-19 Multi-Stage Fracture 2855.20 3002.90 0
2009-11-19 Multi-Stage Fracture 2717.40 2854.20 0
2009-11-19 Multi-Stage Fracture 2579.50 2716.40 0
2009-11-19 Multi-Stage Fracture 2442.90 2578.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 360 0.0 0.0 0.0
2010 6754 0.0 0.0 0.0
2011 6568 0.0 0.0 0.0
2012 7662 0.0 0.0 0.0
2013 8351 0.0 0.0 0.0
2014 8355 0.0 0.0 0.0
2015 8221 0.0 0.0 0.0
2016 8255 0.0 0.0 0.0
2017 8171 0.0 0.0 0.0
2018 8365 0.0 0.0 0.0
2019 8645 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[6]

References