X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675240612020

Well Details

Well ID: 0675240612020
Loading map...
Location: 02/12-06-067-24W5/0
Location Alias: 02/12-06-67-24 W5M
Location Alias 2: 02/12-06-067-24 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 24
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ 102 ANTEN 12-6-67-24
Operator Name: ARC Resources Ltd.
License Number: 0482788
License Date: 2017-02-08
License Status: Issued
Spud Date: 2017-03-20
Final Drill Date: 2017-03-27
Well Total Depth: 3659.00 m
Surface Hole Latitude: 54.787071
Surface Hole Longitude: -117.639433

For data sources see[1][2]

Well History

Date Event
2017-02-08 Obtained License
2017-03-22 Surface Casing Operation Performed
2017-03-25 Direction Drilling Operation Performed - Deviate
2017-03-26 Direction Drilling Operation Performed - Horizontal
2017-03-27 Finished Drilling
2017-03-27 Well Log Performed
2017-03-27 Well Mode changed to Drilled and Cased
2017-03-28 Production Casing Operation Performed
2017-03-29 Plug Back Performed
2017-03-29 Rig Released
2017-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-15 Well Began Production
2017-05-15 Well Fluid changed to Crude Oil
2017-05-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-20 Precision Drilling Corporation 526 N/A Drill To LD
2017-03-20 Precision Drilling Corporation 526 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-25 1532.70 Deviate (5 - 79 degrees)
2017-03-26 2010.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-05-12 Multi-Stage Fracture 3600.60 3600.80 0
2017-05-13 Multi-Stage Fracture 2780.50 2780.70 0
2017-05-13 Multi-Stage Fracture 2685.20 2685.40 0
2017-05-13 Multi-Stage Fracture 2597.60 2597.70 0
2017-05-13 Multi-Stage Fracture 2508.70 2508.90 0
2017-05-14 Multi-Stage Fracture 2423.80 2424.00 0
2017-05-14 Multi-Stage Fracture 2338.30 2338.50 0
2017-05-14 Multi-Stage Fracture 2253.40 2253.60 0
2017-05-14 Multi-Stage Fracture 2168.70 2168.90 0
2017-05-14 Multi-Stage Fracture 2083.70 2083.90 0
2017-05-13 Multi-Stage Fracture 3519.00 3519.20 0
2017-05-13 Multi-Stage Fracture 3423.70 3423.90 0
2017-05-13 Multi-Stage Fracture 3341.10 3341.30 0
2017-05-13 Multi-Stage Fracture 3259.60 3259.80 0
2017-05-13 Multi-Stage Fracture 3163.70 3163.90 0
2017-05-13 Multi-Stage Fracture 3068.30 3068.50 0
2017-05-13 Multi-Stage Fracture 2972.50 2972.70 0
2017-05-13 Multi-Stage Fracture 2876.30 2876.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-12 2017-05-14 1,912 1,137 N/A
2 2017-05-14 2017-05-14 1,912 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 35.1569 N/A
Water 7732-18-5 100 45.36 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 18.3112 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.7819 N/A
Water 7732-18-5 100 0.7819 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3.-diol (BNPD) 52-51-7 100 0.0052 N/A
Methanol 67-56-1 100 0.0052 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0066 N/A
SBL-2 (Buffer) Step Energy Services Buffer Acetic Acid 64-19-7 100 0.0361 N/A
Non-Hazardous Ingredients Not Available 100 0.0361 N/A
SCI-4 (Corrosion Inhibitor) Step Energy Services Corrosion Inhibitor Methanol 67-56-1 100 0.0016 N/A
Modified Thiourea Polymer 68527-49-1 100 0.0016 N/A
Olefin 64743-02-8 100 0.0016 N/A
Polyoxyalkylenes 68951-67-7 100 0.0016 N/A
Propargyl Alcohol 107-19-7 100 0.0016 N/A
SNE-3 (Non-Emulsifier) Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0016 N/A
Methyl Alcohol 67-56-1 100 0.0016 N/A
Non-Hazardous Ingredients Not Available 100 0.0016 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.0016 N/A
SWF-1 (Foamer) Step Energy Services Foamer 1-Dodecanesulfonic acid. hydroxy-. sodium salt 128824-30-6 100 0.0699 N/A
Dodecene-1-sulfonic acid. sodium salt 30965-85-6 100 0.0699 N/A
Non-Hazardous Ingredients Not Available 100 0.0699 N/A
Sodium Hydroxide 1310-73-2 100 0.0699 N/A
SML-7 (Metal to Metal Lubricant) Step Energy Services Friction Reducer Non-Hazardous Ingredients Not Available 100 0.0373 N/A
SWG-201L (Gellant) Step Energy Services Gelling Agent Non-Hazardous Ingredients Not Available 100 0.1989 N/A
SIC-3 (Iron Chelator) Step Energy Services Iron Control Citric Acid 77-92-9 100 0.0041 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0328 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0328 N/A
Methanol 67-56-1 100 0.0328 N/A
Monoethanolamine 141-43-5 100 0.0328 N/A
Oxirane. methyl-. polymer Not Available 100 0.0328 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0328 N/A
Water 7732-18-5 100 0.0328 N/A
2 SAF-3 (Anti Foamer) Step Energy Services Defoamer Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0.0285 N/A
Non-Hazardous Ingredients Not Available 100 0.0284 N/A
Polyethylene glycol monotridecyl ether. liquids 24938-91-8 100 0.0285 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-10 2017-05-15 Surface Water - Runoff 1202

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4312 0.0 0.0 0.0
2018 8027 0.0 0.0 0.0
2019 8231 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-29 No Incident Encountered 0.00 0.00
2017-05-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References