X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675103310000

Well Details

Well ID: 0675103310000
Loading map...
Location: 00/10-33-067-10W5/0
Location Alias: 00/10-33-67-10 W5M
Location Alias 2: 00/10-33-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 33
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-33-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0016534
License Date: 1959-01-05
License Status: Suspension
Spud Date: 1959-01-10
Final Drill Date: 1959-02-09
Well Total Depth: 2468.90 m
Surface Hole Latitude: 54.844746
Surface Hole Longitude: -115.460004

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-01-05 Obtained License
1959-02-09 Finished Drilling
1959-02-09 Well Mode changed to Drilled and Cased
1959-02-14 Production Casing Operation Performed
1959-02-15 Rig Released
1959-02-23 Perforation Treatment Performed - Open-Hole Completion
1959-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-24 Perforation Treatment Performed - Jet Perforation
1959-02-26 Well Began Production
1959-02-26 Well Fluid changed to Crude Oil
1959-02-26 Well Mode changed to Flowing
1971-03-02 Perforation Treatment Performed - Jet Perforation
1971-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-15 Well Began Injection
1971-03-15 Well Fluid changed to Solvent
1971-03-15 Well Type changed to Injection
1975-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-02 Perforation Treatment Performed - Acid Wash - No Pressure
1985-06-14 Perforation Treatment Performed - Fractured
1985-06-15 Well Log Performed
1985-06-17 Perforation Treatment Performed - Cement Squeeze
1985-06-21 Perforation Treatment Performed - Open-Hole Completion
1985-06-22 Perforation Treatment Performed - Jet Perforation
1985-06-23 Perforation Treatment Performed - Jet Perforation
1985-06-23 Well Log Performed
1985-06-25 Perforation Treatment Performed - Fractured
1985-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-03 Well Log Performed
1985-09-11 Well Log Performed
1986-06-09 Well Log Performed
1989-09-27 Well Log Performed
1993-06-29 Well Log Performed
1994-04-21 Well Log Performed
1994-04-25 Well Log Performed
1994-05-14 Well Log Performed
1994-06-09 Perforation Treatment Performed - Jet Perforation
1994-06-09 Well Log Performed
1994-06-21 Well Log Performed
1995-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-05 Perforation Treatment Performed - Jet Perforation
1997-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-06 Well Log Performed
2015-11-01 Well Fluid changed to Solvent
2015-11-01 Well Mode changed to Suspended
2015-11-01 Well Type changed to Injection
2017-09-01 Well Fluid changed to Solvent
2017-09-01 Well Type changed to Injection
2018-07-31 Well Fluid changed to Solvent
2018-07-31 Well Mode changed to Suspended
2018-07-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-02-23 Open Hole/Barefoot Completion 2411.30 2468.90 0
1985-06-14 Fracture 2379.30 2406.70 0
1985-06-17 Cement Squeeze 2379.30 2406.70 0
1985-06-21 Open Hole/Barefoot Completion 2411.30 2431.00 0
1985-06-22 Perforation 2394.10 2398.00 7
1985-06-22 Perforation 2403.50 2406.30 7
1985-06-22 Perforation 2407.20 2409.30 7
1985-06-23 Perforation 2379.60 2380.50 7
1985-06-23 Perforation 2382.00 2382.90 7
1985-06-23 Perforation 2385.10 2386.00 7
1985-06-23 Perforation 2387.40 2388.60 7
1959-02-24 Perforation 2391.50 2406.70 7
1985-06-25 Fracture 2379.60 2431.00 0
1985-06-27 Acid Treatment 2379.60 2409.30 0
1994-06-09 Perforation 2394.00 2398.00 13
1995-08-29 Acid Treatment 2379.60 2431.00 0
1996-05-16 Acid Treatment 2379.60 2431.00 0
1997-06-05 Perforation 2379.30 2380.50 13
1997-06-05 Perforation 2381.70 2385.90 13
1997-06-05 Perforation 2387.20 2388.70 13
1997-06-05 Perforation 2390.50 2392.70 13
1997-06-06 Acid Treatment 2379.30 2431.00 0
1959-02-24 Perforation 2385.40 2391.50 7
1959-02-24 Acid Treatment 2385.40 2406.70 0
1971-03-02 Perforation 2379.30 2385.40 7
1971-03-03 Acid Treatment 2408.20 2468.90 0
1971-03-03 Acid Treatment 2379.30 2408.20 0
1975-04-02 Acid Treatment 2379.30 2468.90 0
1976-07-02 Acid Wash 2379.30 2468.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1970 312 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0

For data sources see[5]

References