X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675102102000

Well Details

Well ID: 0675102102000
Loading map...
Location: 00/02-21-067-10W5/0
Location Alias: 00/02-21-67-10 W5M
Location Alias 2: 00/02-21-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 21
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 2-21-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0018656
License Date: 1960-02-04
License Status: Issued
Spud Date: 1960-02-08
Final Drill Date: 1960-02-29
Well Total Depth: 2467.40 m
Surface Hole Latitude: 54.808995
Surface Hole Longitude: -115.460746

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-02-04 Obtained License
1960-02-29 Finished Drilling
1960-02-29 Perforation Treatment Performed - Open-Hole Completion
1960-02-29 Well Mode changed to Drilled and Cased
1960-03-02 Production Casing Operation Performed
1960-03-23 Perforation Treatment Performed - Jet Perforation
1960-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-27 Well Began Production
1960-03-27 Well Fluid changed to Crude Oil
1960-03-27 Well Mode changed to Flowing
1972-01-21 Perforation Treatment Performed - Jet Perforation
1972-01-21 Well Fluid changed to Crude Oil
1972-01-21 Well Mode changed to Pumping
1972-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-17 Well Began Injection
1974-12-17 Well Fluid changed to Solvent
1974-12-17 Well Type changed to Injection
1975-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-05 Well Log Performed
1984-08-20 Well Log Performed
1984-08-26 Perforation Treatment Performed - Jet Perforation
1984-08-28 Perforation Treatment Performed - Fractured
1984-08-30 Well Log Performed
1984-10-25 Well Log Performed
1986-10-16 Well Log Performed
1993-06-16 Well Log Performed
1993-07-06 Well Log Performed
1994-09-14 Well Log Performed
1994-09-16 Perforation Treatment Performed - Jet Perforation
1994-09-16 Well Log Performed
1994-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-20 Well Log Performed
1994-11-18 Well Log Performed
2004-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-29 Well Fluid changed to Solvent
2020-02-29 Well Mode changed to Suspended
2020-02-29 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-02-29 Open Hole/Barefoot Completion 2448.20 2467.40 0
1960-03-24 Acid Treatment 2396.60 2434.70 0
1972-01-21 Perforation 2360.70 2363.10 7
1972-01-21 Perforation 2364.00 2366.20 7
1972-01-21 Perforation 2366.80 2367.40 7
1972-01-21 Perforation 2368.30 2368.90 7
1972-01-21 Perforation 2371.30 2373.50 7
1972-01-21 Perforation 2374.10 2374.70 7
1972-01-21 Perforation 2378.70 2379.90 7
1972-01-21 Perforation 2380.50 2382.60 7
1972-01-21 Perforation 2383.50 2384.50 7
1960-03-23 Perforation 2396.60 2406.40 7
1972-01-21 Perforation 2385.70 2386.60 7
1972-01-21 Perforation 2387.50 2388.10 0
1972-01-22 Acid Treatment 2360.70 2388.10 0
1975-09-17 Acid Treatment 2357.60 2438.40 0
1984-08-26 Perforation 2393.60 2395.40 7
1984-08-26 Perforation 2357.30 2358.50 7
1984-08-28 Fracture 2357.30 2438.40 0
1994-09-16 Perforation 2378.70 2388.10 13
1994-09-16 Perforation 2393.60 2395.40 13
1994-09-16 Perforation 2396.60 2406.40 13
1960-03-23 Perforation 2407.90 2408.80 7
1994-09-16 Perforation 2407.90 2410.40 13
1994-09-16 Perforation 2417.40 2418.00 13
1994-09-16 Perforation 2426.50 2427.40 13
1994-09-16 Perforation 2429.00 2429.90 13
1994-09-16 Perforation 2433.20 2434.70 13
1994-09-19 Acid Treatment 2393.60 2434.70 0
2004-11-14 Acid Treatment 2357.30 2434.70 0
2017-03-20 Acid Treatment 2357.30 2434.70 0
1960-03-23 Perforation 2409.40 2410.40 7
1960-03-23 Perforation 2411.30 2412.50 7
1960-03-23 Perforation 2417.40 2418.00 7
1960-03-23 Perforation 2426.50 2427.40 7
1960-03-23 Perforation 2429.00 2429.90 7
1960-03-23 Perforation 2433.20 2434.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1969 365 0.0 0.0 0.0
1970 900 0.0 0.0 0.0
1972 6753 0.0 0.0 0.0
1973 8645 0.0 0.0 0.0
1974 7214 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References