X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675101910002

Well Details

Well ID: 0675101910002
Loading map...
Location: 00/10-19-067-10W5/2
Location Alias: 00/10-19-67-10 W5M
Location Alias 2: 00/10-19-067-10 W5/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 19
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-19-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0019734
License Date: 1960-09-21
License Status: Suspension
Spud Date: 1960-09-27
Final Drill Date: 1960-10-19
Well Total Depth: 2568.90 m
Surface Hole Latitude: 54.816359
Surface Hole Longitude: -115.510725

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-21 Obtained License
1960-10-19 Finished Drilling
1960-10-19 Well Mode changed to Drilled and Cased
1960-10-21 Production Casing Operation Performed
1960-10-30 Perforation Treatment Performed - Open-Hole Completion
1960-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-03 Perforation Treatment Performed - Jet Perforation
1960-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-25 Perforation Treatment Performed - Jet Perforation
1970-10-26 Perforation Treatment Performed - Jet Perforation
1970-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-08-12 Perforation Treatment Performed - Bridge Plug No Cement Required
1987-08-12 Plug Back Performed
1987-08-12 Well Log Performed
1987-08-13 Well Log Performed
1987-09-10 Perforation Treatment Performed - Bridge Plug No Cement Required
1987-09-10 Perforation Treatment Performed - Jet Perforation
1987-09-10 Well Log Performed
1987-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-12 Well Log Performed
1987-09-14 Perforation Treatment Performed - Cement Squeeze
1987-09-18 Perforation Treatment Performed - Cement Squeeze
1987-09-21 Well Log Performed
1987-09-24 Perforation Treatment Performed - Jet Perforation
1987-09-24 Well Log Performed
1987-09-26 Perforation Treatment Performed - Cement Squeeze
1987-09-30 Well Log Performed
1987-10-01 Perforation Treatment Performed - Jet Perforation
1987-10-01 Well Log Performed
1987-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-04 Well Log Performed
1987-10-05 Perforation Treatment Performed - Jet Perforation
1987-10-05 Well Log Performed
1987-10-06 Perforation Treatment Performed - Jet Perforation
1987-10-06 Well Log Performed
1987-10-08 Perforation Treatment Performed - Acid Wash - No Pressure
1987-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-13 Well Log Performed
1987-12-17 Well Began Injection
1987-12-17 Well Fluid changed to Water
1987-12-17 Well Type changed to Disposal
2014-03-31 Well Fluid changed to Water
2014-03-31 Well Mode changed to Suspended
2014-03-31 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-30 Open Hole/Barefoot Completion 2549.70 2568.90 0
1970-10-26 Perforation 2526.20 2527.10 7
1970-10-26 Perforation 2531.70 2533.20 7
1970-10-26 Perforation 2533.80 2534.70 7
1970-10-26 Perforation 2503.30 2503.90 7
1970-10-26 Perforation 2506.70 2508.20 7
1970-10-26 Perforation 2484.10 2485.60 7
1970-10-26 Perforation 2486.30 2486.90 7
1970-10-26 Perforation 2491.10 2492.00 7
1970-10-26 Perforation 2467.70 2470.40 7
1970-10-26 Perforation 2471.30 2471.90 7
1960-11-02 Acid Treatment 2549.70 2568.90 0
1970-10-27 Acid Treatment 2471.30 2550.30 0
1987-08-12 Packing Device Capped w/Cement 2434.00 2442.00 0
1987-08-12 Bridge Plug, No Cement 2430.00 2430.00 0
1987-09-10 Bridge Plug, No Cement 2205.00 2205.00 0
1987-09-10 Perforation 2005.00 2005.50 13
1987-09-10 Perforation 1720.00 1720.50 13
1987-09-12 Acid Treatment 2005.00 2005.50 0
1987-09-14 Cement Squeeze 1720.00 1720.50 0
1987-09-18 Cement Squeeze 2005.00 2005.50 0
1987-09-24 Perforation 2075.00 2075.50 13
1960-11-03 Perforation 2492.00 2494.50 7
1987-09-24 Perforation 2055.00 2055.50 13
1987-09-26 Cement Squeeze 2055.00 2075.50 0
1987-10-01 Perforation 1778.50 1782.50 13
1987-10-02 Acid Treatment 1778.50 1782.50 0
1987-10-05 Perforation 1927.50 1950.00 13
1987-10-05 Perforation 1898.50 1925.00 13
1987-10-05 Perforation 1786.00 1791.00 13
1987-10-05 Perforation 1792.00 1874.00 13
1987-10-06 Perforation 1794.80 1874.80 13
1987-10-08 Acid Wash 1778.50 1950.00 0
1960-11-03 Perforation 2474.40 2478.00 7
1987-10-10 Acid Treatment 1778.50 1950.00 0
1960-11-03 Perforation 2471.60 2473.10 7
1960-11-04 Acid Treatment 2471.60 2494.50 0
1960-11-06 Acid Treatment 2549.70 2568.90 0
1970-10-25 Perforation 2549.70 2550.30 7
1970-10-26 Perforation 2524.00 2524.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0

For data sources see[5]

References