X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675101502000

Well Details

Well ID: 0675101502000
Loading map...
Location: 00/02-15-067-10W5/0
Location Alias: 00/02-15-67-10 W5M
Location Alias 2: 00/02-15-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 15
County/Municipality: Big Lakes County
Well Name: CNRL ET AL SWANH 2-15-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0018598
License Date: 1960-01-29
License Status: Issued
Spud Date: 1960-02-04
Final Drill Date: 1960-02-29
Well Total Depth: 2556.70 m
Surface Hole Latitude: 54.794262
Surface Hole Longitude: -115.434929

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-29 Obtained License
1960-02-29 Finished Drilling
1960-02-29 Well Mode changed to Drilled and Cased
1960-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-04 Perforation Treatment Performed - Jet Perforation
1960-03-04 Production Casing Operation Performed
1960-03-05 Perforation Treatment Performed - Acid Wash - No Pressure
1960-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-17 Well Began Production
1960-03-17 Well Fluid changed to Crude Oil
1960-03-17 Well Mode changed to Flowing
1960-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-19 Perforation Treatment Performed - Jet Perforation
1972-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-12 Well Fluid changed to Crude Oil
1973-06-12 Well Mode changed to Pumping
1977-08-17 Perforation Treatment Performed - Cement Squeeze
1977-08-22 Perforation Treatment Performed - Jet Perforation
1977-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-13 Well Log Performed
1990-08-15 Well Log Performed
1990-08-31 Well Fluid changed to Crude Oil
1990-08-31 Well Mode changed to Suspended
1990-09-13 Perforation Treatment Performed - Jet Perforation
1990-09-13 Well Log Performed
1990-09-15 Perforation Treatment Performed - Acid Wash - No Pressure
1990-09-17 Well Log Performed
1990-10-11 Well Began Injection
1990-10-11 Well Fluid changed to Water
1990-10-11 Well Type changed to Injection
1991-03-07 Well Log Performed
2005-03-26 Well Log Performed
2005-04-14 Well Log Performed
2006-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-27 Well Log Performed
2006-11-11 Well Log Performed
2006-12-08 Well Log Performed
2016-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-04 Perforation 2481.70 2487.80 7
1972-11-19 Perforation 2460.00 2461.00 7
1972-11-19 Perforation 2461.90 2465.20 7
1972-11-19 Perforation 2467.70 2471.00 7
1972-11-19 Perforation 2473.80 2475.00 7
1972-11-19 Perforation 2476.80 2478.30 7
1972-11-19 Perforation 2490.20 2492.00 7
1972-11-19 Perforation 2493.90 2495.10 7
1972-11-19 Perforation 2509.10 2510.30 7
1972-11-19 Perforation 2511.20 2511.90 7
1972-11-19 Perforation 2513.40 2515.80 7
1960-03-04 Perforation 2543.30 2546.30 13
1972-11-19 Perforation 2520.40 2521.30 7
1972-11-21 Acid Treatment 2451.20 2521.30 0
1977-08-17 Cement Squeeze 2451.20 2546.30 0
1977-08-22 Perforation 2461.30 2464.30 7
1977-08-22 Perforation 2467.40 2471.30 7
1977-08-22 Perforation 2508.50 2511.60 7
1977-08-22 Perforation 2513.10 2514.60 7
1977-08-22 Perforation 2519.50 2521.30 7
1977-08-24 Acid Treatment 2461.30 2521.30 0
1990-09-13 Perforation 2451.20 2452.40 13
1960-03-04 Acid Treatment 2481.70 2487.80 0
1990-09-13 Perforation 2455.40 2458.50 13
1990-09-13 Perforation 2459.70 2461.00 13
1990-09-13 Perforation 2461.90 2465.20 13
1990-09-13 Perforation 2467.70 2471.00 13
1990-09-13 Perforation 2473.80 2475.00 13
1990-09-13 Perforation 2476.80 2478.30 13
1990-09-13 Perforation 2480.50 2487.80 13
1990-09-13 Perforation 2509.10 2511.90 13
1990-09-13 Perforation 2513.40 2515.80 13
1990-09-13 Perforation 2520.40 2521.30 13
1960-03-05 Acid Wash 2543.30 2546.30 0
1990-09-13 Perforation 2543.30 2546.30 13
1990-09-15 Acid Wash 2451.20 2546.30 0
2006-07-24 Acid Treatment 2451.20 2487.80 0
2016-01-26 Acid Treatment 2451.20 2487.80 0
1960-03-06 Acid Treatment 2481.70 2487.80 0
1960-03-06 Acid Treatment 2543.30 2546.30 0
1960-08-03 Acid Treatment 2481.70 2546.30 0
1972-11-19 Perforation 2451.20 2452.40 7
1972-11-19 Perforation 2455.50 2458.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1969 308 0.0 0.0 0.0
1970 211 0.0 0.0 0.0
1972 1628 0.0 0.0 0.0
1973 8608 0.0 0.0 0.0
1974 7897 0.0 0.0 0.0
1975 8307 0.0 0.0 0.0
1976 3456 0.0 0.0 0.0
1977 4347 0.0 0.0 0.0
1978 7901 0.0 0.0 0.0
1979 8113 0.0 0.0 0.0
1980 8605 0.0 0.0 0.0
1981 6460 0.0 0.0 0.0
1982 8524 0.0 0.0 0.0
1983 7563 0.0 0.0 0.0
1984 7712 0.0 0.0 0.0
1985 8627 0.0 0.0 0.0
1986 8528 0.0 0.0 0.0
1987 8328 0.0 0.0 0.0
1988 7941 0.0 0.0 0.0
1989 5595 0.0 0.0 0.0
1990 1558 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References