X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675101010000

Well Details

Well ID: 0675101010000
Loading map...
Location: 00/10-10-067-10W5/0
Location Alias: 00/10-10-67-10 W5M
Location Alias 2: 00/10-10-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 10
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-10-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0014928
License Date: 1958-03-05
License Status: Abandoned
Spud Date: 1958-03-15
Final Drill Date: 1958-04-23
Well Total Depth: 2619.50 m
Surface Hole Latitude: 54.786825
Surface Hole Longitude: -115.434556

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-03-05 Obtained License
1958-04-23 Finished Drilling
1958-04-23 Well Mode changed to Drilled and Cased
1958-04-24 Well Log Performed
1958-04-27 Production Casing Operation Performed
1958-10-31 Perforation Treatment Performed - Bullet Perforation
1958-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-23 Well Began Production
1958-12-23 Well Fluid changed to Crude Oil
1958-12-23 Well Mode changed to Flowing
1960-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-21 Perforation Treatment Performed - Jet Perforation
1960-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-07-18 Well Began Injection
1972-07-18 Well Fluid changed to Water
1972-07-18 Well Type changed to Injection
1974-02-13 Perforation Treatment Performed - Jet Perforation
1974-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-29 Perforation Treatment Performed - Jet Perforation
1976-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-06 Well Abandoned
1982-02-06 Well Fluid changed to Water
1982-02-06 Well Mode changed to Abandoned
1982-02-06 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-31 Bullet Perforation 2585.30 2588.40 7
1960-07-19 Acid Treatment 2585.30 2588.40 0
1960-07-21 Perforation 2585.30 2588.40 3
1960-07-22 Acid Treatment 2585.30 2588.40 0
1960-07-23 Acid Treatment 2585.30 2588.40 0
1960-07-24 Acid Treatment 2585.30 2588.40 0
1960-07-28 Acid Treatment 2585.30 2588.40 0
1960-08-01 Packing Device Capped w/Cement 2556.70 2588.40 0
1974-02-13 Perforation 2559.70 2560.30 3
1974-02-13 Perforation 2563.70 2564.60 3
1974-02-13 Perforation 2569.80 2570.10 3
1958-10-31 Bullet Perforation 2548.10 2555.70 7
1974-02-13 Perforation 2585.60 2586.20 3
1974-02-20 Acid Treatment 2496.90 2588.40 0
1976-10-29 Perforation 2548.40 2555.70 3
1976-10-29 Perforation 2536.20 2541.40 3
1976-10-29 Perforation 2532.60 2536.20 3
1976-10-30 Acid Treatment 2532.60 2555.70 0
1977-07-19 Acid Treatment 2496.90 2588.40 0
1977-08-06 Acid Treatment 2496.90 2588.40 0
1977-09-18 Acid Treatment 2496.90 2588.40 0
1977-10-02 Acid Treatment 2496.90 2588.40 0
1958-10-31 Bullet Perforation 2559.40 2565.50 7
1977-10-21 Acid Treatment 2496.90 2588.40 0
1977-11-10 Acid Treatment 2496.90 2588.40 0
1978-01-17 Acid Treatment 2496.90 2588.40 0
1978-03-04 Acid Treatment 2496.90 2588.40 0
1978-04-29 Acid Treatment 2496.90 2588.40 0
1978-09-21 Acid Treatment 2496.90 2588.40 0
1979-06-05 Acid Treatment 2496.90 2588.40 0
1982-02-06 Packing Device Capped w/Cement 1495.50 1495.50 0
1958-10-31 Bullet Perforation 2523.10 2527.40 7
1958-10-31 Bullet Perforation 2507.60 2518.30 7
1958-10-31 Bullet Perforation 2496.90 2503.00 7
1958-11-19 Acid Treatment 2496.90 2588.40 0
1960-07-13 Acid Treatment 2585.30 2588.40 0
1960-07-18 Acid Treatment 2585.30 2588.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1972 24 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0

For data sources see[5]

References