X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675100212000

Well Details

Well ID: 0675100212000
Loading map...
Location: 00/12-02-067-10W5/0
Location Alias: 00/12-02-67-10 W5M
Location Alias 2: 00/12-02-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 02
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 12-2-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0019997
License Date: 1960-11-17
License Status: Issued
Spud Date: 1960-12-06
Final Drill Date: 1961-01-06
Well Total Depth: 2695.30 m
Surface Hole Latitude: 54.771980
Surface Hole Longitude: -115.421686

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-11-17 Obtained License
1961-01-06 Finished Drilling
1961-01-06 Well Mode changed to Drilled and Cased
1961-01-08 Perforation Treatment Performed - Cement Squeeze
1961-01-08 Perforation Treatment Performed - Permeator Perforation
1961-01-08 Production Casing Operation Performed
1961-01-27 Perforation Treatment Performed - Jet Perforation
1961-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-07 Well Began Production
1961-03-07 Well Fluid changed to Crude Oil
1961-03-07 Well Mode changed to Flowing
1972-12-06 Perforation Treatment Performed - Jet Perforation
1972-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-24 Well Fluid changed to Crude Oil
1977-02-24 Well Mode changed to Pumping
1979-09-14 Perforation Treatment Performed - Jet Perforation
1979-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-21 Perforation Treatment Performed - Jet Perforation
1982-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-26 Perforation Treatment Performed - Jet Perforation
1983-10-26 Well Log Performed
1983-10-28 Perforation Treatment Performed - Fractured
1983-11-02 Well Log Performed
1984-02-06 Well Began Injection
1984-02-06 Well Fluid changed to Water
1984-02-06 Well Type changed to Injection
1984-03-15 Well Log Performed
1987-07-21 Well Log Performed
1992-07-29 Well Log Performed
1992-07-30 Perforation Treatment Performed - Jet Perforation
1992-07-31 Perforation Treatment Performed - Chemical Squeeze
1992-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-10 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-01-08 Permeator Perforation 2654.50 2660.60 0
1972-12-06 Perforation 2657.20 2657.90 7
1972-12-06 Perforation 2658.50 2659.40 7
1972-12-06 Perforation 2646.90 2647.80 7
1972-12-06 Perforation 2634.10 2635.30 7
1972-12-06 Perforation 2637.70 2639.60 7
1972-12-06 Perforation 2640.80 2641.10 7
1972-12-06 Perforation 2607.60 2610.90 7
1972-12-06 Perforation 2611.80 2612.40 7
1972-12-06 Perforation 2612.70 2614.00 7
1972-12-07 Acid Treatment 2607.60 2659.40 0
1961-01-08 Permeator Perforation 2635.00 2638.30 0
1979-09-14 Perforation 2600.00 2600.70 7
1979-09-14 Perforation 2602.00 2603.00 7
1979-09-15 Acid Treatment 2600.00 2659.40 0
1982-06-21 Perforation 2622.10 2628.50 7
1982-06-21 Perforation 2611.40 2613.80 7
1982-06-24 Acid Treatment 2600.00 2628.50 0
1983-10-26 Perforation 2658.50 2659.40 13
1983-10-26 Perforation 2657.20 2657.90 13
1983-10-26 Perforation 2652.70 2654.80 13
1983-10-26 Perforation 2637.70 2639.50 13
1961-01-08 Permeator Perforation 2614.00 2626.20 0
1983-10-26 Perforation 2634.10 2635.30 13
1983-10-28 Fracture 2600.00 2659.40 0
1992-07-30 Perforation 2599.50 2601.00 13
1992-07-30 Perforation 2601.00 2603.00 7
1992-07-30 Perforation 2608.00 2609.00 7
1992-07-30 Perforation 2616.00 2622.00 7
1992-07-30 Perforation 2646.00 2647.00 13
1992-07-30 Perforation 2651.50 2653.00 13
1992-07-30 Perforation 2655.00 2658.00 13
1992-07-31 Chemical Squeeze 2599.50 2658.00 0
1961-01-08 Cement Squeeze 2614.00 2660.60 0
1992-08-03 Acid Treatment 2599.50 2658.00 0
1961-01-27 Perforation 2614.60 2623.70 7
1961-01-28 Acid Treatment 2614.60 2623.70 0
1972-12-06 Perforation 2652.70 2653.90 7
1972-12-06 Perforation 2654.20 2654.80 7
1972-12-06 Perforation 2656.00 2656.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1972 3050 0.0 0.0 0.0
1973 8578 0.0 0.0 0.0
1974 8294 0.0 0.0 0.0
1975 8521 0.0 0.0 0.0
1976 976 0.0 0.0 0.0
1977 6251 0.0 0.0 0.0
1978 7632 0.0 0.0 0.0
1979 6532 0.0 0.0 0.0
1980 8769 0.0 0.0 0.0
1981 8083 0.0 0.0 0.0
1982 7658 0.0 0.0 0.0
1983 4637 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-04-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References