X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675093210002

Well Details

Well ID: 0675093210002
Loading map...
Location: 00/10-32-067-09W5/2
Location Alias: 00/10-32-67-09 W5M
Location Alias 2: 00/10-32-067-09 W5/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 32
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 10-32-67-9
Operator Name: Razor Energy Corp.
License Number: 0023911
License Date: 1963-02-28
License Status: Issued
Spud Date: 1963-03-14
Final Drill Date: 1963-03-31
Well Total Depth: 2360.70 m
Surface Hole Latitude: 54.845108
Surface Hole Longitude: -115.332824

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-02-28 Obtained License
1963-03-31 Finished Drilling
1963-03-31 Production Casing Operation Performed
1963-03-31 Well Mode changed to Drilled and Cased
1963-06-07 Perforation Treatment Performed - Bullet Perforation
1963-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-02-07 Perforation Treatment Performed - Selective Jet Perforations
1992-11-19 Perforation Treatment Performed - Jet Perforation
1992-11-19 Well Log Performed
1997-04-01 Well Began Injection
1997-04-01 Well Fluid changed to Water
1997-04-01 Well Type changed to Disposal
1997-04-09 Well Log Performed
1997-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-10 Perforation Treatment Performed - Jet Perforation
1997-04-10 Plug Back Performed
1997-04-10 Well Log Performed
1997-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-03 Well Log Performed
2019-05-22 Well Fluid changed to Water
2019-05-22 Well Mode changed to Suspended
2019-05-22 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-07 Bullet Perforation 2313.10 2316.20 7
1965-02-07 Selective Jet Perforations 2322.00 2324.40 0
1992-11-19 Perforation 2329.90 2330.50 13
1992-11-19 Perforation 2331.70 2333.60 13
1992-11-19 Perforation 2335.40 2344.80 13
1997-04-10 Packing Device Capped w/Cement 2293.00 2301.00 0
1997-04-10 Perforation 1762.40 1766.00 13
1997-04-10 Perforation 1750.50 1752.90 13
1997-04-10 Perforation 1717.20 1721.50 13
1997-04-10 Perforation 1691.60 1696.50 13
1997-04-11 Acid Treatment 1691.60 1766.00 0
1963-06-07 Bullet Perforation 2320.40 2324.40 7
1963-06-07 Bullet Perforation 2336.30 2337.20 7
1963-06-08 Acid Treatment 2313.10 2337.20 0
1965-02-07 Selective Jet Perforations 2307.30 2307.90 0
1965-02-07 Selective Jet Perforations 2308.60 2309.20 0
1965-02-07 Selective Jet Perforations 2309.50 2310.10 0
1965-02-07 Selective Jet Perforations 2311.60 2312.20 0
1965-02-07 Selective Jet Perforations 2312.50 2312.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-04-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References