X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675092912020

Well Details

Well ID: 0675092912020
Loading map...
Location: 02/12-29-067-09W5/0
Location Alias: 02/12-29-67-09 W5M
Location Alias 2: 02/12-29-067-09 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 29
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 12-29-67-9
Operator Name: Razor Energy Corp.
License Number: 0039223
License Date: 1970-11-26
License Status: Issued
Spud Date: 1970-12-02
Final Drill Date: 1970-12-22
Well Total Depth: 2371.30 m
Surface Hole Latitude: 54.830637
Surface Hole Longitude: -115.346748

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-11-26 Obtained License
1970-12-22 Finished Drilling
1970-12-22 Well Mode changed to Drilled and Cased
1970-12-24 Production Casing Operation Performed
1970-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-28 Perforation Treatment Performed - Selective Jet Perforations
1971-01-06 Well Began Production
1971-01-06 Well Fluid changed to Crude Oil
1971-01-06 Well Mode changed to Pumping
1981-10-01 Well Fluid changed to Crude Oil
1981-10-01 Well Mode changed to Suspended
1982-03-28 Well Log Performed
1991-04-06 Well Log Performed
1991-04-07 Well Log Performed
1991-04-09 Perforation Treatment Performed - Cement Squeeze
1991-04-11 Perforation Treatment Performed - Jet Perforation
1991-04-11 Well Log Performed
1991-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-01 Well Began Injection
1991-08-01 Well Fluid changed to Water
1991-08-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-12-28 Selective Jet Perforations 2310.10 2311.00 0
1970-12-28 Acid Treatment 2310.10 2321.40 0
1991-04-09 Cement Squeeze 2310.10 2321.40 0
1991-04-11 Perforation 2308.50 2315.50 13
1991-04-12 Acid Treatment 2308.50 2315.50 0
1970-12-28 Selective Jet Perforations 2311.60 2312.50 0
1970-12-28 Selective Jet Perforations 2313.10 2314.30 0
1970-12-28 Selective Jet Perforations 2315.90 2316.20 0
1970-12-28 Selective Jet Perforations 2316.50 2317.70 0
1970-12-28 Selective Jet Perforations 2318.00 2318.30 0
1970-12-28 Selective Jet Perforations 2318.90 2319.20 0
1970-12-28 Selective Jet Perforations 2319.50 2321.10 0
1970-12-28 Selective Jet Perforations 2321.40 2321.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 7724 0.0 0.0 0.0
1972 8443 0.0 0.0 0.0
1973 8473 0.0 0.0 0.0
1974 8491 0.0 0.0 0.0
1975 8360 0.0 0.0 0.0
1976 8487 0.0 0.0 0.0
1977 8122 0.0 0.0 0.0
1978 7472 0.0 0.0 0.0
1979 4671 0.0 0.0 0.0
1980 8743 0.0 0.0 0.0
1981 4516 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References