X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675090601000

Well Details

Well ID: 0675090601000
Loading map...
Location: 00/01-06-067-09W5/0
Location Alias: 00/01-06-67-09 W5M
Location Alias 2: 00/01-06-067-09 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 06
County/Municipality: Big Lakes County
Well Name: CNRL 421585 SWANH 1-6-67-9
Operator Name: Canadian Natural Resources Limited
License Number: 0421585
License Date: 2010-07-02
License Status: Issued
Spud Date: 2010-07-30
Final Drill Date: 2010-08-24
Well Total Depth: 4022.00 m
Surface Hole Latitude: 54.775246
Surface Hole Longitude: -115.367492

For data sources see[1][2]

Well History

Date Event
2010-07-02 Obtained License
2010-07-30 Lost Circulation Occurred
2010-08-03 Surface Casing Operation Performed
2010-08-09 Well Log Performed
2010-08-13 Direction Drilling Operation Performed - Horizontal
2010-08-14 Well Log Performed
2010-08-15 Intermediate Casing Operation Performed
2010-08-24 Finished Drilling
2010-08-24 Well Log Performed
2010-08-24 Well Mode changed to Drilled and Cased
2010-08-25 Well Log Performed
2010-08-28 Well Log Performed
2010-08-29 Liner Casing Operation Performed
2010-08-29 Perforation Treatment Performed - Open-Hole Completion
2010-08-30 Rig Released
2010-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-14 Well Began Production
2010-09-14 Well Fluid changed to Crude Oil
2010-09-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-13 2700.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-29 Open Hole/Barefoot Completion 4003.52 4022.00 0
2010-09-13 Multi-Stage Fracture 3981.40 3981.50 0
2010-09-13 Multi-Stage Fracture 3784.90 3927.70 0
2010-09-13 Multi-Stage Fracture 3553.90 3721.80 0
2010-09-13 Multi-Stage Fracture 3336.80 3491.10 0
2010-09-13 Multi-Stage Fracture 3119.80 3274.20 0
2010-09-13 Multi-Stage Fracture 2939.90 3057.00 0
2010-09-13 Multi-Stage Fracture 2773.10 2892.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1559 0.0 0.0 0.0
2011 8266 0.0 0.0 0.0
2012 8565 0.0 0.0 0.0
2013 8192 0.0 0.0 0.0
2014 8044 0.0 0.0 0.0
2015 6234 0.0 0.0 0.0
2016 8284 0.0 0.0 0.0
2017 8418 0.0 0.0 0.0
2018 8127 0.0 0.0 0.0
2019 7858 0.0 0.0 0.0
2020 1802 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-30 Lost Circulation 78.00 125.00
2010-09-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References