X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675022107000

Well Details

Well ID: 0675022107000
Loading map...
Location: 00/07-21-067-02W5/0
Location Alias: 00/07-21-67-02 W5M
Location Alias 2: 00/07-21-067-02 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 02
Section: 21
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: AMOCO BIG BEND 7-21-67-2
Operator Name: BP Canada Energy Group ULC
License Number: 0062382
License Date: 1977-01-26
License Status: RecCertified
Spud Date: 1977-01-30
Final Drill Date: 1977-02-02
Well Total Depth: 792.50 m
Surface Hole Latitude: 54.811212
Surface Hole Longitude: -114.237896

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-01-26 Obtained License
1977-02-02 Drill Stem Test Performed
1977-02-02 Finished Drilling
1977-02-03 Well Log Performed
1977-02-04 Production Casing Operation Performed
1977-02-04 Well Mode changed to Drilled and Cased
1977-03-11 Perforation Treatment Performed - Jet Perforation
1978-02-28 Well Began Production
1978-02-28 Well Fluid changed to Gas
1978-02-28 Well Mode changed to Flowing
1979-04-10 Well Fluid changed to Gas
1979-04-10 Well Mode changed to Suspended
1996-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-21 Plug Back Performed
1996-06-22 Perforation Treatment Performed - Jet Perforation
1996-06-22 Well Log Performed
1996-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-24 Perforation Treatment Performed - Remedial Casing
1996-07-20 Well Fluid changed to Gas
1996-07-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-03-11 Perforation 760.20 761.10 13
1996-06-21 Packing Device Capped w/Cement 742.00 750.00 0
1996-06-22 Perforation 242.00 243.00 13
1996-06-24 Remedial Casing Cementing 242.00 243.00 0
1996-06-24 Packing Device Capped w/Cement 200.00 240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 730 0.0 0.0 0.0

For data sources see[5]

References