X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674261506002

Well Details

Well ID: 0674261506002
Loading map...
Location: 00/06-15-067-26W4/2
Location Alias: 00/06-15-67-26 W4M
Location Alias 2: 00/06-15-067-26 W4/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 26
Section: 15
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: AMOCO BIG BEND 6-15-67-26
Operator Name: BP Canada Energy Group ULC
License Number: 0049153
License Date: 1974-02-25
License Status: RecCertified
Spud Date: 1974-03-02
Final Drill Date: 1974-03-06
Well Total Depth: 865.60 m
Surface Hole Latitude: 54.796103
Surface Hole Longitude: -113.887636

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-02-25 Obtained License
1974-03-06 Finished Drilling
1974-03-06 Well Mode changed to Drilled and Cased
1974-03-07 Drill Stem Test Performed
1974-03-08 Drill Stem Test Performed
1974-03-09 Drill Stem Test Performed
1974-03-10 Production Casing Operation Performed
1974-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-14 Perforation Treatment Performed - Acid Wash - No Pressure
1974-11-14 Perforation Treatment Performed - Jet Perforation
1974-11-15 Perforation Treatment Performed - Jet Perforation
1974-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-17 Perforation Treatment Performed - Acid Wash - No Pressure
1974-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-11-17 Perforation Treatment Performed - Jet Perforation
1975-03-23 Well Began Production
1975-03-23 Well Fluid changed to Gas
1975-03-23 Well Mode changed to Flowing
1977-11-07 Well Fluid changed to Gas
1977-11-07 Well Mode changed to Suspended
1986-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-07 Perforation Treatment Performed - Cement Squeeze
1986-07-07 Plug Back Performed
1986-07-07 Well Fluid changed to Gas
1986-07-07 Well Mode changed to Abandoned Zone
1986-07-09 Perforation Treatment Performed - Jet Perforation
1986-07-09 Well Log Performed
1986-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-15 Perforation Treatment Performed - Cement Squeeze
1986-10-18 Perforation Treatment Performed - Jet Perforation
2000-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-23 Plug Back Performed
2000-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-24 Plug Back Performed
2000-07-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-11-14 Perforation 805.60 807.10 7
1986-07-07 Cement Squeeze 610.20 612.00 0
1986-07-09 Perforation 661.10 662.30 13
1986-10-15 Acid Treatment 661.10 662.30 0
1986-10-15 Cement Squeeze 661.10 662.30 0
1986-10-18 Perforation 614.80 615.70 13
1986-10-18 Perforation 618.70 619.40 13
1986-10-18 Perforation 623.60 624.80 13
2000-06-23 Packing Device Capped w/Cement 833.70 841.70 0
2000-06-23 Packing Device Capped w/Cement 791.60 799.60 0
2000-06-24 Packing Device Capped w/Cement 596.30 604.30 0
1974-11-14 Acid Wash 805.60 807.10 0
1974-11-14 Acid Treatment 805.60 807.10 0
1974-11-15 Perforation 848.00 848.90 7
1974-11-17 Packing Device Capped w/Cement 839.70 839.70 0
1974-11-17 Perforation 610.20 612.00 7
1974-11-17 Acid Wash 610.20 612.00 0
1974-11-17 Acid Treatment 610.20 612.00 0
1986-07-07 Acid Treatment 610.20 612.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 6502 0.0 0.0 0.0
1976 4048 0.0 0.0 0.0
1977 3211 0.0 0.0 0.0

For data sources see[5]

References