X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674130911000

Well Details

Well ID: 0674130911000
Loading map...
Location: 00/11-09-067-13W4/0
Location Alias: 00/11-09-67-13 W4M
Location Alias 2: 00/11-09-067-13 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 13
Section: 09
County/Municipality: Lac La Biche County
Well Name: MNK LA BICHE 11-9-67-13
Operator Name: Manitok Energy Inc.
License Number: 0016670
License Date: 1959-02-05
License Status: Suspension
Spud Date: 1959-04-02
Final Drill Date: 1959-04-17
Well Total Depth: 524.00 m
Surface Hole Latitude: 54.786119
Surface Hole Longitude: -111.928546

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-05 Obtained License
1959-04-05 Drill Stem Test Performed
1959-04-06 Liner Casing Operation Performed
1959-04-17 Finished Drilling
1959-04-21 Perforation Treatment Performed - Bullet Perforation
1959-06-17 Perforation Treatment Performed - Cement Squeeze
1959-06-18 Perforation Treatment Performed - Jet Perforation
1959-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-20 Perforation Treatment Performed - Cement Squeeze
1959-06-20 Perforation Treatment Performed - Jet Perforation
1959-08-10 Well Mode changed to Drilled and Cased
1968-11-25 Well Began Production
1968-11-25 Well Fluid changed to Gas
1968-11-25 Well Mode changed to Flowing
1977-02-01 Well Fluid changed to Gas
1977-02-01 Well Mode changed to Suspended
1993-12-06 Well Fluid changed to Gas
1993-12-06 Well Mode changed to Flowing
2019-04-01 Well Fluid changed to Gas
2019-04-01 Well Mode changed to Suspended
2020-02-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-04-21 Bullet Perforation 499.00 502.00 0
1959-06-20 Perforation 471.50 476.10 13
1959-06-20 Perforation 467.90 470.90 13
1959-06-17 Cement Squeeze 499.00 502.00 0
1959-06-18 Perforation 496.50 497.10 13
1959-06-19 Acid Treatment 496.50 497.10 0
1959-06-20 Cement Squeeze 496.50 497.10 0
1959-06-20 Perforation 487.70 489.20 13
1959-06-20 Perforation 481.60 483.10 13
1959-06-20 Perforation 480.10 481.60 13
1959-06-20 Cement Squeeze 480.10 489.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 696 0.0 0.0 0.0
1969 7944 0.0 0.0 0.0
1970 7704 0.0 0.0 0.0
1971 5594 0.0 0.0 0.0
1972 5238 0.0 0.0 0.0
1973 7048 0.0 0.0 0.0
1974 5116 0.0 0.0 0.0
1975 3368 0.0 0.0 0.0
1976 2045 0.0 0.0 0.0
1977 648 0.0 0.0 0.0
1993 600 0.0 0.0 0.0
1994 4336 0.0 0.0 0.0
1995 7072 0.0 0.0 0.0
1996 4450 0.0 0.0 0.0
1997 5930 0.0 0.0 0.0
1998 6972 0.0 0.0 0.0
1999 5276 0.0 0.0 0.0
2000 6163 0.0 0.0 0.0
2001 8476 0.0 0.0 0.0
2002 8453 0.0 0.0 0.0
2003 8312 0.0 0.0 0.0
2004 8522 0.0 0.0 0.0
2005 8671 0.0 0.0 0.0
2006 8355 0.0 0.0 0.0
2007 8638 0.0 0.0 0.0
2008 8560 0.0 0.0 0.0
2009 8567 0.0 0.0 0.0
2010 7691 0.0 0.0 0.0
2011 8632 0.0 0.0 0.0
2012 7511 0.0 0.0 0.0
2013 8154 0.0 0.0 0.0
2014 8757 0.0 0.0 0.0
2015 5141 0.0 0.0 0.0

For data sources see[5]

References