X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674051301030

Well Details

Well ID: 0674051301030
Loading map...
Location: 03/01-13-067-05W4/0
Location Alias: 03/01-13-67-05 W4M
Location Alias 2: 03/01-13-067-05 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 05
Section: 13
County/Municipality: Improvement District No. 349
Well Name: CNRL 21A40 FSHR CK 1-13-67-5
Operator Name: Canadian Natural Resources Limited
License Number: 0454832
License Date: 2013-02-11
License Status: Issued
Spud Date: 2013-05-10
Final Drill Date: 2013-11-09
Well Total Depth: 2753.00 m
Surface Hole Latitude: 54.787860
Surface Hole Longitude: -110.650467

For data sources see[1][2]

Well History

Date Event
2013-02-11 Obtained License
2013-05-10 Direction Drilling Operation Performed - Deviate
2013-05-10 Well Mode changed to Preset
2013-05-11 Surface Casing Operation Performed
2013-11-04 Direction Drilling Operation Performed - Horizontal
2013-11-05 Well Log Performed
2013-11-06 Intermediate Casing Operation Performed
2013-11-09 Finished Drilling
2013-11-09 Well Log Performed
2013-11-09 Well Mode changed to Drilled and Cased
2013-11-10 Liner Casing Operation Performed
2013-11-10 Perforation Treatment Performed - Open-Hole Completion
2013-11-10 Perforation Treatment Performed - Slotted Liner or Casing
2013-11-10 Rig Released
2013-11-10 Well Log Performed
2014-09-01 Well Began Production
2014-09-01 Well Fluid changed to Crude Bitumen
2014-09-01 Well Type changed to Cyclical
2016-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-03 Ensign Drilling Inc. 127 2755 Resumption
2013-05-10 Ensign Drilling Inc. 127 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-05-10 83.00 Deviate (5 - 79 degrees)
2013-11-04 685.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-11-10 Slotted Liner 1059.00 2731.90 0
2013-11-10 Open Hole/Barefoot Completion 2731.90 2753.00 0
2016-09-12 Acid Treatment 1059.00 2753.00 0
2018-07-10 Acid Treatment 1059.00 2753.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1285 0.0 0.0 0.0
2015 6365 0.0 0.0 0.0
2016 7579 0.0 0.0 0.0
2017 7272 0.0 0.0 0.0
2018 6160 0.0 0.0 0.0
2019 8484 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-11 No Incident Encountered 0.00 0.00
2013-11-10 No Incident Encountered 0.00 0.00
2014-02-02 No Incident Encountered 0.00 0.00
2016-09-12 No Incident Encountered 0.00 0.00
2018-07-10 No Incident Encountered 0.00 0.00

For data sources see[8]

References