X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674043414003

Well Details

Well ID: 0674043414003
Loading map...
Location: 00/14-34-067-04W4/3
Location Alias: 00/14-34-67-04 W4M
Location Alias 2: 00/14-34-067-04 W4/03
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 34
County/Municipality: Improvement District No. 349
Well Name: CNRL 3A31 PRIMROSE 15-34-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0301743
License Date: 2004-01-15
License Status: Amended
Spud Date: 2004-03-06
Final Drill Date: 2004-04-13
Well Total Depth: 1932.00 m
Surface Hole Latitude: 54.849505
Surface Hole Longitude: -110.506569

For data sources see[1][2]

Well History

Date Event
2004-01-15 Obtained License
2004-03-06 Surface Casing Operation Performed
2004-04-06 Direction Drilling Operation Performed - Horizontal
2004-04-07 Well Log Performed
2004-04-08 Intermediate Casing Operation Performed
2004-04-12 Direction Drilling Operation Performed - Horizontal
2004-04-13 Direction Drilling Operation Performed - Horizontal
2004-04-13 Finished Drilling
2004-04-13 Well Log Performed
2004-04-13 Well Mode changed to Drilled and Cased
2004-04-14 Liner Casing Operation Performed
2004-04-14 Perforation Treatment Performed - Open-Hole Completion
2004-04-14 Perforation Treatment Performed - Slotted Liner or Casing
2004-04-14 Rig Released
2005-05-30 Well Began Production
2005-05-30 Well Fluid changed to Crude Bitumen
2005-05-30 Well Type changed to Cyclical
2013-02-07 Perforation Treatment Performed - Jet Perforation
2013-02-08 Perforation Treatment Performed - Jet Perforation
2019-05-13 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-04-06 150.00 Horizontal
2004-04-12 1445.00 Horizontal
2004-04-13 1616.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-04-14 Slotted Liner 710.00 1922.00 0
2013-02-07 Perforation 1395.50 1396.50 6
2013-02-08 Perforation 1329.50 1330.50 6
2013-02-08 Perforation 1264.10 1265.10 6
2013-02-08 Perforation 1199.60 1200.60 6
2013-02-08 Perforation 1134.60 1135.60 6
2013-02-08 Perforation 1069.30 1070.30 6
2013-02-08 Perforation 1004.30 1005.30 6
2013-02-08 Perforation 926.30 927.30 6
2013-02-08 Perforation 873.60 874.60 6
2013-02-08 Perforation 820.90 821.90 6
2004-04-14 Open Hole/Barefoot Completion 1922.00 1932.00 0
2013-02-08 Perforation 768.10 769.10 6
2013-02-08 Perforation 715.80 716.80 6
2013-02-07 Perforation 1849.60 1850.60 6
2013-02-07 Perforation 1784.70 1785.70 6
2013-02-07 Perforation 1719.80 1720.80 6
2013-02-07 Perforation 1654.50 1655.50 6
2013-02-07 Perforation 1589.40 1590.40 6
2013-02-07 Perforation 1525.20 1526.20 6
2013-02-07 Perforation 1460.70 1461.70 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4140 0.0 0.0 0.0
2006 7263 0.0 0.0 0.0
2007 6437 0.0 0.0 0.0
2008 8745 0.0 0.0 0.0
2009 8450 0.0 0.0 0.0
2010 5820 0.0 0.0 0.0
2011 8748 0.0 0.0 0.0
2012 8652 0.0 0.0 0.0
2013 7658 0.0 0.0 0.0
2014 6099 0.0 0.0 0.0
2015 8285 0.0 0.0 0.0
2016 7664 0.0 0.0 0.0
2017 8752 0.0 0.0 0.0
2018 7961 0.0 0.0 0.0
2019 6394 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References