X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674043411022

Well Details

Well ID: 0674043411022
Loading map...
Location: 02/11-34-067-04W4/2
Location Alias: 02/11-34-67-04 W4M
Location Alias 2: 02/11-34-067-04 W4/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 34
County/Municipality: Improvement District No. 349
Well Name: CNRL 1A31 PRIMROSE 10-34-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0301741
License Date: 2004-01-15
License Status: Amended
Spud Date: 2004-03-02
Final Drill Date: 2004-04-01
Well Total Depth: 2238.00 m
Surface Hole Latitude: 54.849348
Surface Hole Longitude: -110.506570

For data sources see[1][2]

Well History

Date Event
2004-01-15 Obtained License
2004-03-02 Surface Casing Operation Performed
2004-03-22 Direction Drilling Operation Performed - Horizontal
2004-03-24 Intermediate Casing Operation Performed
2004-03-29 Direction Drilling Operation Performed - Horizontal
2004-04-01 Finished Drilling
2004-04-01 Liner Casing Operation Performed
2004-04-01 Perforation Treatment Performed - Open-Hole Completion
2004-04-01 Perforation Treatment Performed - Slotted Liner or Casing
2004-04-01 Well Mode changed to Drilled and Cased
2004-04-02 Rig Released
2004-07-25 Well Log Performed
2005-05-13 Well Began Production
2005-05-13 Well Fluid changed to Crude Bitumen
2005-05-13 Well Type changed to Cyclical
2013-05-05 Perforation Treatment Performed - Jet Perforation
2013-05-06 Perforation Treatment Performed - Jet Perforation
2015-05-05 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-03-22 260.00 Horizontal
2004-03-29 1450.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-04-01 Slotted Liner 966.00 2228.00 0
2013-05-05 Perforation 2033.00 2034.00 6
2013-05-05 Perforation 2102.40 2103.40 6
2013-05-05 Perforation 2154.50 2155.50 6
2013-05-06 Perforation 986.70 987.70 6
2013-05-06 Perforation 1077.80 1078.80 6
2013-05-06 Perforation 1143.10 1144.10 6
2013-05-06 Perforation 1220.90 1221.90 6
2013-05-06 Perforation 1299.40 1300.40 6
2013-05-06 Perforation 1363.90 1364.90 6
2013-05-06 Perforation 1441.40 1442.40 6
2004-04-01 Open Hole/Barefoot Completion 2228.00 2238.00 0
2013-05-06 Perforation 1531.80 1532.80 6
2013-05-06 Perforation 1583.20 1584.20 6
2013-05-05 Perforation 1635.90 1636.90 6
2013-05-05 Perforation 1686.70 1687.70 6
2013-05-05 Perforation 1752.00 1753.00 6
2013-05-05 Perforation 1803.70 1804.70 6
2013-05-05 Perforation 1868.60 1869.60 6
2013-05-05 Perforation 1921.20 1922.20 6
2013-05-05 Perforation 1973.60 1974.60 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4508 0.0 0.0 0.0
2006 6557 0.0 0.0 0.0
2007 6877 0.0 0.0 0.0
2008 8436 0.0 0.0 0.0
2009 7868 0.0 0.0 0.0
2010 3756 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 8539 0.0 0.0 0.0
2013 7760 0.0 0.0 0.0
2014 6747 0.0 0.0 0.0
2015 8004 0.0 0.0 0.0
2016 8149 0.0 0.0 0.0
2017 8752 0.0 0.0 0.0
2018 8697 0.0 0.0 0.0
2019 7303 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References