X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674042008030

Well Details

Well ID: 0674042008030
Loading map...
Location: 03/08-20-067-04W4/0
Location Alias: 03/08-20-67-04 W4M
Location Alias 2: 03/08-20-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 20
County/Municipality: Improvement District No. 349
Well Name: AMOCO 3D9 PRIMROSE 8-20-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0187154
License Date: 1996-04-09
License Status: Issued
Spud Date: 1996-05-30
Final Drill Date: 1996-06-02
Well Total Depth: 1410.00 m
Surface Hole Latitude: 54.812008
Surface Hole Longitude: -110.583441

For data sources see[1][2]

Well History

Date Event
1996-04-09 Obtained License
1996-05-29 Well Log Performed
1996-05-30 Conductor Casing Operation Performed
1996-05-30 Direction Drilling Operation Performed - Horizontal
1996-05-31 Well Log Performed
1996-06-01 Intermediate Casing Operation Performed
1996-06-02 Finished Drilling
1996-06-02 Well Log Performed
1996-06-02 Well Mode changed to Drilled and Cased
1996-06-03 Liner Casing Operation Performed
1996-06-03 Perforation Treatment Performed - Open-Hole Completion
1996-06-03 Perforation Treatment Performed - Slotted Liner or Casing
1996-06-03 Rig Released
1996-08-01 Well Began Production
1996-08-01 Well Fluid changed to Crude Bitumen
1996-08-01 Well Type changed to Cyclical
2016-04-30 Well Fluid changed to Crude Bitumen
2016-04-30 Well Mode changed to Suspended
2016-04-30 Well Type changed to Cyclical
2017-04-01 Well Fluid changed to Crude Bitumen
2017-04-01 Well Type changed to Cyclical
2018-12-31 Well Fluid changed to Crude Bitumen
2018-12-31 Well Mode changed to Suspended
2018-12-31 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-05-30 140.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-03 Slotted Liner 801.00 1405.00 0
1996-06-03 Open Hole/Barefoot Completion 1405.00 1410.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1420 0.0 0.0 0.0
1997 5419 0.0 0.0 0.0
1998 6458 0.0 0.0 0.0
1999 7499 0.0 0.0 0.0
2000 8190 0.0 0.0 0.0
2001 7083 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 6604 0.0 0.0 0.0
2004 6206 0.0 0.0 0.0
2005 8748 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8710 0.0 0.0 0.0
2008 8753 0.0 0.0 0.0
2009 5918 0.0 0.0 0.0
2010 8329 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 8640 0.0 0.0 0.0
2013 8585 0.0 0.0 0.0
2014 7586 0.0 0.0 0.0
2015 2462 0.0 0.0 0.0
2017 6549 0.0 0.0 0.0
2018 6989 0.0 0.0 0.0

For data sources see[6]

References