X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674042008000

Well Details

Well ID: 0674042008000
Loading map...
Location: 00/08-20-067-04W4/0
Location Alias: 00/08-20-67-04 W4M
Location Alias 2: 00/08-20-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 20
County/Municipality: Improvement District No. 349
Well Name: AMOCO 1D9 PRIMROSE 8-20-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0187156
License Date: 1996-04-09
License Status: Suspension
Spud Date: 1996-06-07
Final Drill Date: 1996-06-10
Well Total Depth: 1461.00 m
Surface Hole Latitude: 54.811828
Surface Hole Longitude: -110.583441

For data sources see[1][2]

Well History

Date Event
1996-04-09 Obtained License
1996-06-07 Conductor Casing Operation Performed
1996-06-07 Direction Drilling Operation Performed - Horizontal
1996-06-07 Well Log Performed
1996-06-08 Well Log Performed
1996-06-09 Intermediate Casing Operation Performed
1996-06-10 Finished Drilling
1996-06-10 Well Log Performed
1996-06-10 Well Mode changed to Drilled and Cased
1996-06-11 Liner Casing Operation Performed
1996-06-11 Perforation Treatment Performed - Open-Hole Completion
1996-06-11 Perforation Treatment Performed - Slotted Liner or Casing
1996-06-11 Rig Released
1996-08-01 Well Began Production
1996-08-01 Well Fluid changed to Crude Bitumen
1996-08-01 Well Type changed to Cyclical
2014-07-31 Well Fluid changed to Crude Bitumen
2014-07-31 Well Mode changed to Suspended
2014-07-31 Well Type changed to Cyclical
2014-09-01 Well Fluid changed to Crude Bitumen
2014-09-01 Well Type changed to Cyclical
2018-12-31 Well Fluid changed to Crude Bitumen
2018-12-31 Well Mode changed to Suspended
2018-12-31 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-07 140.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-11 Slotted Liner 829.20 1455.00 0
1996-06-11 Open Hole/Barefoot Completion 1455.00 1461.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1340 0.0 0.0 0.0
1997 5751 0.0 0.0 0.0
1998 6437 0.0 0.0 0.0
1999 6965 0.0 0.0 0.0
2000 7262 0.0 0.0 0.0
2001 7106 0.0 0.0 0.0
2002 8026 0.0 0.0 0.0
2003 7282 0.0 0.0 0.0
2004 6486 0.0 0.0 0.0
2005 8748 0.0 0.0 0.0
2006 8500 0.0 0.0 0.0
2007 8710 0.0 0.0 0.0
2008 8636 0.0 0.0 0.0
2009 6163 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 7702 0.0 0.0 0.0
2012 8561 0.0 0.0 0.0
2013 5048 0.0 0.0 0.0
2014 2147 0.0 0.0 0.0
2015 6547 0.0 0.0 0.0
2016 7513 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7037 0.0 0.0 0.0

For data sources see[6]

References