X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674041910030

Well Details

Well ID: 0674041910030
Loading map...
Location: 03/10-19-067-04W4/0
Location Alias: 03/10-19-67-04 W4M
Location Alias 2: 03/10-19-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 19
County/Municipality: Improvement District No. 349
Well Name: AMOCO 1B10 PRIMROSE 10-19-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0187672
License Date: 1996-05-09
License Status: Suspension
Spud Date: 1996-06-29
Final Drill Date: 1996-07-02
Well Total Depth: 1444.00 m
Surface Hole Latitude: 54.817649
Surface Hole Longitude: -110.584532

For data sources see[1][2]

Well History

Date Event
1996-05-09 Obtained License
1996-06-29 Conductor Casing Operation Performed
1996-06-29 Direction Drilling Operation Performed - Horizontal
1996-06-30 Well Log Performed
1996-07-01 Intermediate Casing Operation Performed
1996-07-02 Finished Drilling
1996-07-02 Well Log Performed
1996-07-02 Well Mode changed to Drilled and Cased
1996-07-03 Liner Casing Operation Performed
1996-07-03 Perforation Treatment Performed - Open-Hole Completion
1996-07-03 Perforation Treatment Performed - Slotted Liner or Casing
1996-07-03 Rig Released
1996-07-09 Well Log Performed
1996-12-01 Well Began Production
1996-12-01 Well Fluid changed to Crude Bitumen
1996-12-01 Well Type changed to Cyclical
2016-08-31 Well Fluid changed to Crude Bitumen
2016-08-31 Well Mode changed to Suspended
2016-08-31 Well Type changed to Cyclical
2016-10-01 Well Fluid changed to Crude Bitumen
2016-10-01 Well Type changed to Cyclical
2018-01-31 Well Fluid changed to Crude Bitumen
2018-01-31 Well Mode changed to Suspended
2018-01-31 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-29 21.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-03 Slotted Liner 812.00 1437.00 0
1996-07-03 Open Hole/Barefoot Completion 1437.00 1444.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 204 0.0 0.0 0.0
1997 4634 0.0 0.0 0.0
1998 6411 0.0 0.0 0.0
1999 7188 0.0 0.0 0.0
2000 7500 0.0 0.0 0.0
2001 7762 0.0 0.0 0.0
2002 8418 0.0 0.0 0.0
2003 7391 0.0 0.0 0.0
2004 6532 0.0 0.0 0.0
2005 8694 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8611 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 6309 0.0 0.0 0.0
2010 8690 0.0 0.0 0.0
2011 8553 0.0 0.0 0.0
2012 7112 0.0 0.0 0.0
2013 5757 0.0 0.0 0.0
2014 4934 0.0 0.0 0.0
2015 6311 0.0 0.0 0.0
2016 1404 0.0 0.0 0.0
2017 8634 0.0 0.0 0.0
2018 420 0.0 0.0 0.0

For data sources see[6]

References