X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674041602020

Well Details

Well ID: 0674041602020
Loading map...
Location: 02/02-16-067-04W4/0
Location Alias: 02/02-16-67-04 W4M
Location Alias 2: 02/02-16-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 16
County/Municipality: Improvement District No. 349
Well Name: AMOCO 2B19 PRIMROSE 2-16-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0202429
License Date: 1997-06-11
License Status: Suspension
Spud Date: 1997-08-15
Final Drill Date: 1997-08-18
Well Total Depth: 1452.00 m
Surface Hole Latitude: 54.795156
Surface Hole Longitude: -110.533742

For data sources see[1][2]

Well History

Date Event
1997-06-11 Obtained License
1997-08-16 Direction Drilling Operation Performed - Horizontal
1997-08-17 Intermediate Casing Operation Performed
1997-08-17 Well Log Performed
1997-08-18 Finished Drilling
1997-08-18 Well Log Performed
1997-08-18 Well Mode changed to Drilled and Cased
1997-08-19 Liner Casing Operation Performed
1997-08-19 Perforation Treatment Performed - Open-Hole Completion
1997-08-19 Perforation Treatment Performed - Slotted Liner or Casing
1997-08-19 Rig Released
1997-08-19 Well Log Performed
1997-09-02 Well Log Performed
1998-03-01 Well Began Production
1998-03-01 Well Fluid changed to Crude Bitumen
1998-03-01 Well Type changed to Cyclical
2016-08-31 Well Fluid changed to Crude Bitumen
2016-08-31 Well Mode changed to Suspended
2016-08-31 Well Type changed to Cyclical
2017-06-01 Well Fluid changed to Crude Bitumen
2017-06-01 Well Type changed to Cyclical
2018-09-30 Well Fluid changed to Crude Bitumen
2018-09-30 Well Mode changed to Suspended
2018-09-30 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-08-16 141.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-19 Slotted Liner 821.00 1446.00 0
1997-08-19 Open Hole/Barefoot Completion 1446.00 1452.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4251 0.0 0.0 0.0
1999 6514 0.0 0.0 0.0
2000 7752 0.0 0.0 0.0
2001 7529 0.0 0.0 0.0
2002 6912 0.0 0.0 0.0
2003 7213 0.0 0.0 0.0
2004 8262 0.0 0.0 0.0
2005 8616 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7829 0.0 0.0 0.0
2008 5431 0.0 0.0 0.0
2009 8678 0.0 0.0 0.0
2010 8292 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 7656 0.0 0.0 0.0
2013 8466 0.0 0.0 0.0
2014 7870 0.0 0.0 0.0
2015 1745 0.0 0.0 0.0
2017 4416 0.0 0.0 0.0
2018 2159 0.0 0.0 0.0

For data sources see[6]

References