X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674041416060

Well Details

Well ID: 0674041416060
Loading map...
Location: 06/16-14-067-04W4/0
Location Alias: 06/16-14-67-04 W4M
Location Alias 2: 06/16-14-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 14
County/Municipality: Improvement District No. 349
Well Name: CNRL 5C28 PRIMROSE 16-14-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0349086
License Date: 2006-01-16
License Status: Amended
Spud Date: 2006-08-17
Final Drill Date: 2006-10-10
Well Total Depth: 2097.00 m
Surface Hole Latitude: 54.807615
Surface Hole Longitude: -110.515279

For data sources see[1][2]

Well History

Date Event
2006-01-16 Obtained License
2006-08-18 Surface Casing Operation Performed
2006-09-09 Direction Drilling Operation Performed - Horizontal
2006-09-11 Intermediate Casing Operation Performed
2006-09-13 Well Log Performed
2006-10-10 Finished Drilling
2006-10-10 Well Mode changed to Drilled and Cased
2006-10-11 Liner Casing Operation Performed
2006-10-11 Perforation Treatment Performed - Open-Hole Completion
2006-10-11 Perforation Treatment Performed - Slotted Liner or Casing
2006-10-11 Well Log Performed
2006-10-12 Rig Released
2007-01-07 Well Log Performed
2007-06-01 Well Began Production
2007-06-01 Well Fluid changed to Crude Bitumen
2007-06-01 Well Type changed to Cyclical
2009-04-08 Well Log Performed
2009-04-09 Well Log Performed
2009-10-28 Well Log Performed
2012-02-27 Well Log Performed
2012-02-29 Well Log Performed
2012-03-01 Perforation Treatment Performed - Jet Perforation
2012-03-02 Perforation Treatment Performed - Jet Perforation
2012-03-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-09-09 205.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-11 Slotted Liner 906.00 2092.00 0
2012-03-01 Perforation 1752.70 1753.70 6
2012-03-01 Perforation 1687.00 1688.00 6
2012-03-01 Perforation 1660.10 1661.10 6
2012-03-02 Perforation 1633.40 1634.40 6
2012-03-02 Perforation 1593.60 1594.60 6
2012-03-02 Perforation 1553.90 1554.90 6
2012-03-02 Perforation 1514.00 1515.00 6
2012-03-02 Perforation 1474.30 1475.30 6
2012-03-02 Perforation 1434.50 1435.50 6
2012-03-02 Perforation 1394.40 1395.40 6
2006-10-11 Open Hole/Barefoot Completion 2092.00 2097.00 0
2012-03-03 Perforation 1354.80 1355.80 6
2012-03-03 Perforation 1288.10 1289.10 6
2012-03-03 Perforation 1249.10 1250.10 6
2012-03-03 Perforation 1209.30 1210.30 6
2012-03-03 Perforation 1169.50 1170.50 6
2012-03-03 Perforation 1129.80 1130.80 6
2012-03-03 Perforation 1076.80 1077.80 6
2012-03-03 Perforation 1023.90 1024.90 6
2012-03-03 Perforation 971.10 972.20 6
2012-03-03 Perforation 918.10 919.10 6
2012-03-01 Perforation 2031.40 2032.40 6
2012-03-01 Perforation 1991.10 1992.10 6
2012-03-01 Perforation 1951.40 1952.40 6
2012-03-01 Perforation 1911.60 1912.60 6
2012-03-01 Perforation 1871.80 1872.80 6
2012-03-01 Perforation 1832.10 1833.10 6
2012-03-01 Perforation 1792.60 1793.70 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 3970 0.0 0.0 0.0
2008 6976 0.0 0.0 0.0
2009 8115 0.0 0.0 0.0
2010 7545 0.0 0.0 0.0
2011 4898 0.0 0.0 0.0
2012 8280 0.0 0.0 0.0
2013 7618 0.0 0.0 0.0
2014 7812 0.0 0.0 0.0
2015 7578 0.0 0.0 0.0
2016 5941 0.0 0.0 0.0
2017 402 0.0 0.0 0.0
2018 5050 0.0 0.0 0.0
2019 8742 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References