X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674040815002

Well Details

Well ID: 0674040815002
Loading map...
Location: 00/15-08-067-04W4/2
Location Alias: 00/15-08-67-04 W4M
Location Alias 2: 00/15-08-067-04 W4/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 08
County/Municipality: Improvement District No. 349
Well Name: AMOCO ET AL 13 PRIMROSE 15C-8-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0150781
License Date: 1991-11-27
License Status: Suspension
Spud Date: 1991-12-27
Final Drill Date: 1992-01-04
Well Total Depth: 1381.00 m
Surface Hole Latitude: 54.789740
Surface Hole Longitude: -110.560544

For data sources see[1][2]

Well History

Date Event
1991-11-27 Obtained License
1991-12-27 Well Log Performed
1991-12-29 Intermediate Casing Operation Performed
1992-01-01 Direction Drilling Operation Performed - Horizontal
1992-01-04 Finished Drilling
1992-01-04 Well Log Performed
1992-01-04 Well Mode changed to Drilled and Cased
1992-01-06 Well Log Performed
1992-01-07 Liner Casing Operation Performed
1992-01-07 Perforation Treatment Performed - Slotted Liner or Casing
1992-01-07 Rig Released
1992-03-30 Well Began Production
1992-03-30 Well Fluid changed to Crude Bitumen
1992-03-30 Well Mode changed to Pumping
1993-04-09 Well Fluid changed to Crude Bitumen
1993-04-09 Well Type changed to Cyclical
2008-07-31 Well Fluid changed to Crude Bitumen
2008-07-31 Well Mode changed to Suspended
2008-07-31 Well Type changed to Cyclical
2008-10-01 Well Fluid changed to Crude Bitumen
2008-10-01 Well Type changed to Cyclical
2010-09-30 Well Fluid changed to Crude Bitumen
2010-09-30 Well Mode changed to Suspended
2010-09-30 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-01-01 725.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-07 Slotted Liner 725.50 1373.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5317 0.0 0.0 0.0
1993 896 0.0 0.0 0.0
1994 3287 0.0 0.0 0.0
1995 5988 0.0 0.0 0.0
1996 4624 0.0 0.0 0.0
1997 5033 0.0 0.0 0.0
1998 6660 0.0 0.0 0.0
1999 1047 0.0 0.0 0.0
2000 6479 0.0 0.0 0.0
2001 4281 0.0 0.0 0.0
2002 8231 0.0 0.0 0.0
2003 3048 0.0 0.0 0.0
2004 6847 0.0 0.0 0.0
2005 8524 0.0 0.0 0.0
2006 5903 0.0 0.0 0.0
2007 4476 0.0 0.0 0.0
2008 1220 0.0 0.0 0.0
2009 5974 0.0 0.0 0.0

For data sources see[6]

References