X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674040605030

Well Details

Well ID: 0674040605030
Loading map...
Location: 03/05-06-067-04W4/0
Location Alias: 03/05-06-67-04 W4M
Location Alias 2: 03/05-06-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 06
County/Municipality: Improvement District No. 349
Well Name: AMOCO 1A2 PRIMROSE 5-6-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0177294
License Date: 1995-04-06
License Status: Suspension
Spud Date: 1995-06-12
Final Drill Date: 1995-06-16
Well Total Depth: 1451.00 m
Surface Hole Latitude: 54.771076
Surface Hole Longitude: -110.597251

For data sources see[1][2]

Well History

Date Event
1995-04-06 Obtained License
1995-06-12 Conductor Casing Operation Performed
1995-06-12 Direction Drilling Operation Performed - Horizontal
1995-06-12 Well Log Performed
1995-06-14 Intermediate Casing Operation Performed
1995-06-16 Finished Drilling
1995-06-16 Well Log Performed
1995-06-16 Well Mode changed to Drilled and Cased
1995-06-17 Liner Casing Operation Performed
1995-06-17 Perforation Treatment Performed - Open-Hole Completion
1995-06-17 Perforation Treatment Performed - Slotted Liner or Casing
1995-06-17 Rig Released
1995-06-23 Well Log Performed
1995-07-25 Well Began Production
1995-07-25 Well Fluid changed to Crude Bitumen
1995-07-25 Well Mode changed to Pumping
1995-07-26 Well Fluid changed to Crude Bitumen
1995-07-26 Well Type changed to Cyclical
2016-10-31 Well Fluid changed to Crude Bitumen
2016-10-31 Well Mode changed to Suspended
2016-10-31 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-06-12 132.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-17 Slotted Liner 834.00 1445.00 0
1995-06-17 Open Hole/Barefoot Completion 1445.00 1451.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2009 0.0 0.0 0.0
1996 4933 0.0 0.0 0.0
1997 6213 0.0 0.0 0.0
1998 5334 0.0 0.0 0.0
1999 7189 0.0 0.0 0.0
2000 7072 0.0 0.0 0.0
2001 8612 0.0 0.0 0.0
2002 7195 0.0 0.0 0.0
2003 8206 0.0 0.0 0.0
2004 8401 0.0 0.0 0.0
2005 6616 0.0 0.0 0.0
2006 8167 0.0 0.0 0.0
2007 8710 0.0 0.0 0.0
2008 8339 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8627 0.0 0.0 0.0
2012 8062 0.0 0.0 0.0
2013 8554 0.0 0.0 0.0
2014 6944 0.0 0.0 0.0
2015 6120 0.0 0.0 0.0
2016 2696 0.0 0.0 0.0

For data sources see[6]

References