X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674040510AK0

Well Details

Well ID: 0674040510AK0
Loading map...
Location: AK/10-05-067-04W4/0
Location Alias: AK/10-05-67-04 W4M
Location Alias 2: AK/10-05-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 05
County/Municipality: Improvement District No. 349
Well Name: AMOCO 15BH MOORE EX 10-5-67-5
Operator Name: Canadian Natural Resources Limited
License Number: 0101914
License Date: 1983-06-27
License Status: Suspension
Spud Date: 1983-07-11
Final Drill Date: 1983-07-13
Well Total Depth: 613.00 m
Surface Hole Latitude: 54.773426
Surface Hole Longitude: -110.576274

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-06-27 Obtained License
1983-07-11 Direction Drilling Operation Performed - Deviate
1983-07-11 Production Casing Operation Performed
1983-07-13 Finished Drilling
1983-07-13 Well Mode changed to Drilled and Cased
1983-07-14 Rig Released
1983-09-02 Perforation Treatment Performed - Jet Perforation
1984-02-01 Well Began Production
1984-02-01 Well Fluid changed to Crude Bitumen
1984-02-01 Well Type changed to Cyclical
1987-07-02 Well Fluid changed to Crude Bitumen
1987-07-02 Well Mode changed to Suspended
1987-07-02 Well Type changed to Cyclical
1996-02-11 Well Fluid changed to Crude Bitumen
1996-02-11 Well Type changed to Cyclical
2001-11-30 Well Fluid changed to Crude Bitumen
2001-11-30 Well Mode changed to Suspended
2001-11-30 Well Type changed to Cyclical
2001-12-06 Perforation Treatment Performed - Cement Plug
2010-11-03 Well Fluid changed to Crude Bitumen
2010-11-03 Well Type changed to Cyclical
2011-06-01 Well Fluid changed to Crude Bitumen
2011-06-01 Well Mode changed to Suspended
2011-06-01 Well Type changed to Cyclical
2013-06-01 Well Fluid changed to Crude Bitumen
2013-06-01 Well Type changed to Cyclical
2014-06-30 Well Fluid changed to Crude Bitumen
2014-06-30 Well Mode changed to Suspended
2014-06-30 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-07-11 30.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-02 Perforation 554.00 567.00 13
1983-09-02 Perforation 569.00 576.00 13
2001-12-06 Cement Plug 551.40 554.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 4167 0.0 0.0 0.0
1985 5682 0.0 0.0 0.0
1986 1755 0.0 0.0 0.0
1987 500 0.0 0.0 0.0
1996 2412 0.0 0.0 0.0
1997 5184 0.0 0.0 0.0
1998 1952 0.0 0.0 0.0
1999 245 0.0 0.0 0.0
2000 1097 0.0 0.0 0.0
2010 552 0.0 0.0 0.0
2013 2514 0.0 0.0 0.0

For data sources see[6]

References