X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674040509000

Well Details

Well ID: 0674040509000
Loading map...
Location: 00/09-05-067-04W4/0
Location Alias: 00/09-05-67-04 W4M
Location Alias 2: 00/09-05-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 05
County/Municipality: Improvement District No. 349
Well Name: AMOCO CD3 PRIMROSE 9-5-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0179301
License Date: 1995-07-17
License Status: Suspension
Spud Date: 1995-08-03
Final Drill Date: 1995-08-06
Well Total Depth: 1760.00 m
Surface Hole Latitude: 54.776906
Surface Hole Longitude: -110.585137

For data sources see[1][2]

Well History

Date Event
1995-07-17 Obtained License
1995-08-03 Conductor Casing Operation Performed
1995-08-03 Direction Drilling Operation Performed - Horizontal
1995-08-03 Well Log Performed
1995-08-04 Intermediate Casing Operation Performed
1995-08-06 Finished Drilling
1995-08-06 Well Log Performed
1995-08-06 Well Mode changed to Drilled and Cased
1995-08-07 Liner Casing Operation Performed
1995-08-07 Perforation Treatment Performed - Open-Hole Completion
1995-08-07 Perforation Treatment Performed - Slotted Liner or Casing
1995-08-07 Rig Released
1995-08-09 Well Log Performed
1996-02-17 Well Began Production
1996-02-17 Well Fluid changed to Crude Bitumen
1996-02-17 Well Type changed to Cyclical
2015-06-30 Well Fluid changed to Crude Bitumen
2015-06-30 Well Mode changed to Suspended
2015-06-30 Well Type changed to Cyclical
2017-07-01 Well Fluid changed to Crude Bitumen
2017-07-01 Well Type changed to Cyclical
2018-03-31 Well Fluid changed to Crude Bitumen
2018-03-31 Well Mode changed to Suspended
2018-03-31 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-08-03 115.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-07 Slotted Liner 874.50 1752.00 0
1995-08-07 Open Hole/Barefoot Completion 1752.00 1760.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5984 0.0 0.0 0.0
1997 8434 0.0 0.0 0.0
1998 1915 0.0 0.0 0.0
1999 1136 0.0 0.0 0.0
2000 4716 0.0 0.0 0.0
2001 8683 0.0 0.0 0.0
2002 7036 0.0 0.0 0.0
2003 8483 0.0 0.0 0.0
2004 8617 0.0 0.0 0.0
2005 8567 0.0 0.0 0.0
2006 6679 0.0 0.0 0.0
2007 8710 0.0 0.0 0.0
2008 8730 0.0 0.0 0.0
2009 7152 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8727 0.0 0.0 0.0
2012 8744 0.0 0.0 0.0
2013 4213 0.0 0.0 0.0
2014 45 0.0 0.0 0.0
2017 209 0.0 0.0 0.0

For data sources see[6]

References