X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674040310080

Well Details

Well ID: 0674040310080
Loading map...
Location: 08/10-03-067-04W4/0
Location Alias: 08/10-03-67-04 W4M
Location Alias 2: 08/10-03-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 03
County/Municipality: Improvement District No. 349
Well Name: CNRL 13A25 PRIMROSE 10-3-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0442919
License Date: 2012-01-16
License Status: Issued
Spud Date: 2012-04-21
Final Drill Date: 2012-06-25
Well Total Depth: 1590.00 m
Surface Hole Latitude: 54.770568
Surface Hole Longitude: -110.505742

For data sources see[1][2]

Well History

Date Event
2012-01-16 Obtained License
2012-04-21 Well Mode changed to Preset
2012-04-22 Surface Casing Operation Performed
2012-05-27 Direction Drilling Operation Performed - Deviate
2012-05-27 Direction Drilling Operation Performed - Horizontal
2012-05-28 Well Log Performed
2012-05-29 Intermediate Casing Operation Performed
2012-06-25 Finished Drilling
2012-06-25 Liner Casing Operation Performed
2012-06-25 Perforation Treatment Performed - Open-Hole Completion
2012-06-25 Perforation Treatment Performed - Slotted Liner or Casing
2012-06-25 Rig Released
2012-06-25 Well Log Performed
2012-06-25 Well Mode changed to Drilled and Cased
2012-10-05 Well Log Performed
2013-06-01 Well Began Production
2013-06-01 Well Fluid changed to Crude Bitumen
2013-06-01 Well Type changed to Cyclical
2015-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-08-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-21 Precision Drilling Corporation 399 N/A Set Surface
2012-06-24 Precision Drilling Corporation 399 1592 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-27 197.00 Deviate (5 - 79 degrees)
2012-05-27 613.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-25 Slotted Liner 833.50 1577.20 0
2018-08-13 Perforation 1305.20 1311.20 10
2018-08-13 Perforation 1267.70 1273.70 10
2018-08-13 Perforation 1230.00 1236.00 10
2018-08-13 Perforation 1180.00 1186.00 10
2018-08-13 Perforation 1143.20 1149.20 10
2018-08-13 Perforation 1106.40 1112.40 10
2018-08-13 Perforation 1069.60 1075.60 10
2018-08-13 Perforation 1032.90 1038.90 10
2018-08-13 Perforation 996.20 1002.20 10
2018-08-13 Perforation 959.50 965.50 10
2012-06-25 Open Hole/Barefoot Completion 1577.20 1590.00 0
2018-08-13 Perforation 923.10 929.10 10
2018-08-13 Perforation 873.80 879.80 10
2015-12-07 Acid Treatment 833.50 1590.00 0
2018-08-13 Perforation 1543.00 1549.00 10
2018-08-13 Perforation 1505.40 1511.40 10
2018-08-13 Perforation 1468.00 1474.00 10
2018-08-13 Perforation 1430.50 1436.50 10
2018-08-13 Perforation 1380.30 1386.30 10
2018-08-13 Perforation 1342.80 1348.80 10

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4016 0.0 0.0 0.0
2014 6886 0.0 0.0 0.0
2015 5890 0.0 0.0 0.0
2016 7361 0.0 0.0 0.0
2017 8398 0.0 0.0 0.0
2018 7106 0.0 0.0 0.0
2019 8588 0.0 0.0 0.0
2020 1921 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-22 No Incident Encountered 0.00 0.00
2012-06-25 No Incident Encountered 0.00 0.00
2012-12-29 No Incident Encountered 0.00 0.00
2015-12-07 No Incident Encountered 0.00 0.00
2018-08-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References