X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674032602050

Well Details

Well ID: 0674032602050
Loading map...
Location: 05/02-26-067-03W4/0
Location Alias: 05/02-26-67-03 W4M
Location Alias 2: 05/02-26-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 26
County/Municipality: Improvement District No. 349
Well Name: CNRL 6A92 PRIMROSE 2-26-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0432908
License Date: 2011-04-07
License Status: Suspension
Spud Date: 2011-05-17
Final Drill Date: 2011-10-07
Well Total Depth: 1876.00 m
Surface Hole Latitude: 54.811878
Surface Hole Longitude: -110.352821

For data sources see[1][2]

Well History

Date Event
2011-04-07 Obtained License
2011-05-17 Surface Casing Operation Performed
2011-09-29 Direction Drilling Operation Performed - Horizontal
2011-09-29 Well Log Performed
2011-10-01 Intermediate Casing Operation Performed
2011-10-07 Finished Drilling
2011-10-07 Liner Casing Operation Performed
2011-10-07 Well Mode changed to Drilled and Cased
2011-10-08 Perforation Treatment Performed - Open-Hole Completion
2011-10-08 Perforation Treatment Performed - Slotted Liner or Casing
2011-10-08 Rig Released
2011-12-19 Well Log Performed
2016-09-01 Well Began Production
2016-09-01 Well Fluid changed to Crude Bitumen
2016-09-01 Well Type changed to Cyclical
2017-05-31 Well Fluid changed to Crude Bitumen
2017-05-31 Well Mode changed to Suspended
2017-05-31 Well Type changed to Cyclical
2018-06-01 Well Fluid changed to Crude Bitumen
2018-06-01 Well Type changed to Cyclical
2019-09-01 Well Fluid changed to Crude Bitumen
2019-09-01 Well Mode changed to Suspended
2019-09-01 Well Type changed to Cyclical
2019-10-01 Well Fluid changed to Crude Bitumen
2019-10-01 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-29 174.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-08 Slotted Liner 976.00 1861.00 0
2011-10-08 Open Hole/Barefoot Completion 1861.00 1876.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 596 0.0 0.0 0.0
2018 2428 0.0 0.0 0.0
2019 5115 0.0 0.0 0.0
2020 1231 0.0 0.0 0.0

For data sources see[6]

References