If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0674032601060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.812327,"lon":-110.352491,"icon":""}]} |
Location: 06/01-26-067-03W4/0 | |
Location Alias: 06/01-26-67-03 W4M | |
Location Alias 2: 06/01-26-067-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 4 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CNRL 1A92 PRIMROSE 1-26-67-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0432903 | |
License Date: 2011-04-07 | |
License Status: Amended | |
Spud Date: 2011-05-11 | |
Final Drill Date: 2012-02-24 | |
Well Total Depth: 2057.00 m | |
Surface Hole Latitude: 54.812327 | |
Surface Hole Longitude: -110.352491 |
Date | Event |
---|---|
2011-04-07 | Obtained License |
2011-05-11 | Surface Casing Operation Performed |
2012-02-06 | Direction Drilling Operation Performed - Horizontal |
2012-02-06 | Well Log Performed |
2012-02-09 | Well Log Performed |
2012-02-11 | Intermediate Casing Operation Performed |
2012-02-24 | Finished Drilling |
2012-02-24 | Liner Casing Operation Performed |
2012-02-24 | Well Log Performed |
2012-02-24 | Well Mode changed to Drilled and Cased |
2012-02-25 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-25 | Perforation Treatment Performed - Slotted Liner or Casing |
2012-02-25 | Rig Released |
2012-03-12 | Well Log Performed |
2012-10-01 | Well Began Production |
2012-10-01 | Well Fluid changed to Crude Bitumen |
2012-10-01 | Well Type changed to Cyclical |
2012-10-15 | Well Log Performed |
2012-10-16 | Well Log Performed |
2016-04-30 | Well Fluid changed to Crude Bitumen |
2016-04-30 | Well Mode changed to Suspended |
2016-04-30 | Well Type changed to Cyclical |
2016-05-01 | Well Fluid changed to Crude Bitumen |
2016-05-01 | Well Type changed to Cyclical |
2019-12-12 | Well Log Performed |
2019-12-13 | Perforation Treatment Performed - Jet Perforation |
2019-12-14 | Perforation Treatment Performed - Jet Perforation |
2019-12-15 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-23 | Ensign Drilling Inc. | 9 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-06 | 160.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-25 | Slotted Liner | 1157.00 | 2045.00 | 0 |
2019-12-14 | Perforation | 1730.50 | 1736.50 | 10 |
2019-12-14 | Perforation | 1693.80 | 1696.80 | 10 |
2019-12-14 | Perforation | 1545.80 | 1551.80 | 10 |
2019-12-15 | Perforation | 1508.10 | 1514.10 | 10 |
2019-12-15 | Perforation | 1471.50 | 1477.50 | 10 |
2019-12-15 | Perforation | 1434.00 | 1440.00 | 10 |
2019-12-15 | Perforation | 1396.40 | 1402.40 | 10 |
2019-12-15 | Perforation | 1359.10 | 1365.10 | 10 |
2019-12-15 | Perforation | 1321.50 | 1327.50 | 10 |
2019-12-15 | Perforation | 1284.20 | 1290.20 | 10 |
2012-02-25 | Open Hole/Barefoot Completion | 2045.00 | 2057.00 | 0 |
2019-12-15 | Perforation | 1247.50 | 1253.50 | 10 |
2019-12-15 | Perforation | 1198.60 | 1204.60 | 10 |
2019-12-15 | Perforation | 1162.10 | 1168.10 | 10 |
2019-12-13 | Perforation | 2011.30 | 2017.30 | 10 |
2019-12-13 | Perforation | 1974.60 | 1982.60 | 10 |
2019-12-13 | Perforation | 1938.00 | 1944.00 | 10 |
2019-12-14 | Perforation | 1889.00 | 1895.00 | 10 |
2019-12-14 | Perforation | 1852.20 | 1858.20 | 10 |
2019-12-14 | Perforation | 1803.50 | 1809.50 | 10 |
2019-12-14 | Perforation | 1767.20 | 1773.20 | 10 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 865 | 0.0 | 0.0 | 0.0 |
2013 | 8173 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 2551 | 0.0 | 0.0 | 0.0 |
2016 | 2744 | 0.0 | 0.0 | 0.0 |
2017 | 6875 | 0.0 | 0.0 | 0.0 |
2018 | 8639 | 0.0 | 0.0 | 0.0 |
2019 | 8253 | 0.0 | 0.0 | 0.0 |
2020 | 2042 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-20 | No Incident Encountered | 0.00 | 0.00 |
2019-12-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]