X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674032504W00

Well Details

Well ID: 0674032504W00
Loading map...
Location: W0/04-25-067-03W4/0
Location Alias: W0/04-25-67-03 W4M
Location Alias 2: W0/04-25-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 25
County/Municipality: Improvement District No. 349
Well Name: CNRL 6A91 PRIMROSE 4-25-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0431858
License Date: 2011-02-25
License Status: Amended
Spud Date: 2011-09-13
Final Drill Date: 2011-12-09
Well Total Depth: 2312.00 m
Surface Hole Latitude: 54.806621
Surface Hole Longitude: -110.335172

For data sources see[1][2]

Well History

Date Event
2011-02-25 Obtained License
2011-09-14 Surface Casing Operation Performed
2011-11-18 Direction Drilling Operation Performed - Horizontal
2011-11-20 Well Log Performed
2011-11-21 Intermediate Casing Operation Performed
2011-12-09 Finished Drilling
2011-12-09 Well Log Performed
2011-12-09 Well Mode changed to Drilled and Cased
2011-12-10 Liner Casing Operation Performed
2011-12-10 Perforation Treatment Performed - Open-Hole Completion
2011-12-10 Perforation Treatment Performed - Slotted Liner or Casing
2011-12-10 Rig Released
2012-02-28 Well Log Performed
2012-10-02 Well Began Production
2012-10-02 Well Fluid changed to Crude Bitumen
2012-10-02 Well Type changed to Cyclical
2013-07-26 Well Log Performed
2014-06-30 Well Fluid changed to Crude Bitumen
2014-06-30 Well Mode changed to Suspended
2014-06-30 Well Type changed to Cyclical
2015-03-01 Well Fluid changed to Crude Bitumen
2015-03-01 Well Type changed to Cyclical
2017-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-18 190.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-10 Slotted Liner 930.00 2297.00 0
2011-12-10 Open Hole/Barefoot Completion 2297.00 2312.00 0
2017-02-11 Acid Treatment 930.00 2312.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 787 0.0 0.0 0.0
2013 7544 0.0 0.0 0.0
2015 4909 0.0 0.0 0.0
2016 5038 0.0 0.0 0.0
2017 952 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-17 No Incident Encountered 0.00 0.00
2017-02-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References