X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674032504020

Well Details

Well ID: 0674032504020
Loading map...
Location: 02/04-25-067-03W4/0
Location Alias: 02/04-25-67-03 W4M
Location Alias 2: 02/04-25-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 25
County/Municipality: Improvement District No. 349
Well Name: CNRL 3A91 PRIMROSE 4-25-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0431855
License Date: 2011-02-25
License Status: Issued
Spud Date: 2011-09-06
Final Drill Date: 2012-01-18
Well Total Depth: 2349.00 m
Surface Hole Latitude: 54.807070
Surface Hole Longitude: -110.334957

For data sources see[1][2]

Well History

Date Event
2011-02-25 Obtained License
2011-09-07 Surface Casing Operation Performed
2012-01-09 Direction Drilling Operation Performed - Horizontal
2012-01-09 Well Log Performed
2012-01-11 Well Log Performed
2012-01-12 Intermediate Casing Operation Performed
2012-01-18 Finished Drilling
2012-01-18 Well Log Performed
2012-01-18 Well Mode changed to Drilled and Cased
2012-01-19 Liner Casing Operation Performed
2012-01-19 Perforation Treatment Performed - Open-Hole Completion
2012-01-19 Perforation Treatment Performed - Slotted Liner or Casing
2012-01-20 Rig Released
2012-04-22 Well Log Performed
2012-10-01 Well Began Production
2012-10-01 Well Fluid changed to Crude Bitumen
2012-10-01 Well Type changed to Cyclical
2014-10-01 Well Fluid changed to Crude Bitumen
2014-10-01 Well Mode changed to Suspended
2014-10-01 Well Type changed to Cyclical
2015-03-01 Well Fluid changed to Crude Bitumen
2015-03-01 Well Type changed to Cyclical
2017-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-15 Ensign Drilling Inc. 126 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-09 175.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-19 Slotted Liner 970.00 2335.30 0
2012-01-19 Open Hole/Barefoot Completion 2335.30 2349.00 0
2017-01-23 Acid Treatment 970.00 2349.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 790 0.0 0.0 0.0
2013 5782 0.0 0.0 0.0
2015 5530 0.0 0.0 0.0
2016 5104 0.0 0.0 0.0
2017 7549 0.0 0.0 0.0
2018 8384 0.0 0.0 0.0
2019 8625 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-25 No Incident Encountered 0.00 0.00
2017-01-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References