X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674032403040

Well Details

Well ID: 0674032403040
Loading map...
Location: 04/03-24-067-03W4/0
Location Alias: 04/03-24-67-03 W4M
Location Alias 2: 04/03-24-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 24
County/Municipality: Improvement District No. 349
Well Name: CNRL 5A90 PRIMROSE 3-24-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0430341
License Date: 2011-01-20
License Status: Amended
Spud Date: 2011-09-27
Final Drill Date: 2012-03-26
Well Total Depth: 1854.00 m
Surface Hole Latitude: 54.798218
Surface Hole Longitude: -110.333369

For data sources see[1][2]

Well History

Date Event
2011-01-20 Obtained License
2011-09-28 Surface Casing Operation Performed
2012-03-14 Direction Drilling Operation Performed - Deviate
2012-03-14 Well Log Performed
2012-03-16 Direction Drilling Operation Performed - Horizontal
2012-03-18 Intermediate Casing Operation Performed
2012-03-24 Well Log Performed
2012-03-26 Finished Drilling
2012-03-26 Well Mode changed to Drilled and Cased
2012-03-27 Liner Casing Operation Performed
2012-03-27 Perforation Treatment Performed - Open-Hole Completion
2012-03-27 Perforation Treatment Performed - Slotted Liner or Casing
2012-03-27 Rig Released
2012-04-29 Well Log Performed
2012-11-01 Well Began Production
2012-11-01 Well Fluid changed to Crude Bitumen
2012-11-01 Well Type changed to Cyclical
2014-10-01 Well Fluid changed to Crude Bitumen
2014-10-01 Well Mode changed to Suspended
2014-10-01 Well Type changed to Cyclical
2015-02-01 Well Fluid changed to Crude Bitumen
2015-02-01 Well Type changed to Cyclical
2017-08-09 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-14 170.00 Deviate (5 - 79 degrees)
2012-03-16 660.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-27 Slotted Liner 953.00 1842.80 0
2017-08-09 Perforation 1229.70 1235.70 10
2017-08-09 Perforation 1267.50 1273.50 10
2017-08-09 Perforation 1305.30 1311.30 10
2017-08-09 Perforation 1342.90 1348.90 10
2017-08-09 Perforation 1380.60 1386.60 10
2017-08-09 Perforation 1418.40 1424.40 10
2017-08-09 Perforation 1468.70 1474.70 10
2017-08-09 Perforation 1506.30 1512.30 10
2017-08-09 Perforation 1544.10 1550.10 10
2017-08-09 Perforation 1581.50 1587.50 10
2012-03-27 Open Hole/Barefoot Completion 1842.80 1854.00 0
2017-08-09 Perforation 1619.30 1625.30 10
2017-08-09 Perforation 1657.10 1663.10 10
2017-08-09 Perforation 1694.80 1700.80 10
2017-08-09 Perforation 1732.50 1738.50 10
2017-08-09 Perforation 968.00 974.00 10
2017-08-09 Perforation 1005.20 1011.20 10
2017-08-09 Perforation 1042.40 1048.40 10
2017-08-09 Perforation 1080.10 1086.10 10
2017-08-09 Perforation 1117.50 1123.50 10
2017-08-09 Perforation 1154.90 1160.90 10
2017-08-09 Perforation 1192.30 1198.30 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 680 0.0 0.0 0.0
2013 7589 0.0 0.0 0.0
2014 3 0.0 0.0 0.0
2015 5576 0.0 0.0 0.0
2016 5101 0.0 0.0 0.0
2017 7661 0.0 0.0 0.0
2018 8025 0.0 0.0 0.0
2019 7985 0.0 0.0 0.0
2020 1805 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-27 No Incident Encountered 0.00 0.00
2012-05-21 No Incident Encountered 0.00 0.00
2017-08-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References