If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0674030111020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.783522,"lon":-110.315756,"icon":""}]} |
Location: 02/11-01-067-03W4/0 | |
Location Alias: 02/11-01-67-03 W4M | |
Location Alias 2: 02/11-01-067-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 4 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CNRL 18A78 PRIMROSE 11-1-67-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0375426 | |
License Date: 2007-03-02 | |
License Status: Issued | |
Spud Date: 2007-04-04 | |
Final Drill Date: 2007-06-27 | |
Well Total Depth: 1954.00 m | |
Surface Hole Latitude: 54.783522 | |
Surface Hole Longitude: -110.315756 |
Date | Event |
---|---|
2007-03-02 | Obtained License |
2007-04-05 | Surface Casing Operation Performed |
2007-05-29 | Direction Drilling Operation Performed - Horizontal |
2007-05-31 | Intermediate Casing Operation Performed |
2007-05-31 | Well Log Performed |
2007-06-27 | Finished Drilling |
2007-06-27 | Well Mode changed to Drilled and Cased |
2007-06-28 | Liner Casing Operation Performed |
2007-06-28 | Perforation Treatment Performed - Open-Hole Completion |
2007-06-28 | Perforation Treatment Performed - Slotted Liner or Casing |
2007-06-28 | Rig Released |
2007-06-28 | Well Log Performed |
2007-11-29 | Well Log Performed |
2008-12-01 | Well Began Production |
2008-12-01 | Well Fluid changed to Crude Bitumen |
2008-12-01 | Well Type changed to Cyclical |
2009-03-10 | Well Log Performed |
2009-03-13 | Well Log Performed |
2009-03-19 | Well Log Performed |
2012-02-21 | Well Log Performed |
2012-02-22 | Well Log Performed |
2012-03-29 | Well Log Performed |
2019-11-01 | Well Fluid changed to Crude Bitumen |
2019-11-01 | Well Mode changed to Suspended |
2019-11-01 | Well Type changed to Cyclical |
2019-12-01 | Well Fluid changed to Crude Bitumen |
2019-12-01 | Well Type changed to Cyclical |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-05-29 | 102.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-06-28 | Slotted Liner | 1053.00 | 1949.00 | 0 |
2007-06-28 | Open Hole/Barefoot Completion | 1949.00 | 1954.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 4815 | 0.0 | 0.0 | 0.0 |
2010 | 2772 | 0.0 | 0.0 | 0.0 |
2011 | 5318 | 0.0 | 0.0 | 0.0 |
2012 | 5206 | 0.0 | 0.0 | 0.0 |
2013 | 8656 | 0.0 | 0.0 | 0.0 |
2014 | 3005 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]