X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674030110000

Well Details

Well ID: 0674030110000
Loading map...
Location: 00/10-01-067-03W4/0
Location Alias: 00/10-01-67-03 W4M
Location Alias 2: 00/10-01-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 01
County/Municipality: Improvement District No. 349
Well Name: CNRL 11A78 PRIMROSE 10-1-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0375418
License Date: 2007-03-02
License Status: Issued
Spud Date: 2007-03-30
Final Drill Date: 2007-04-27
Well Total Depth: 1681.00 m
Surface Hole Latitude: 54.783117
Surface Hole Longitude: -110.315252

For data sources see[1][2]

Well History

Date Event
2007-03-02 Obtained License
2007-03-31 Surface Casing Operation Performed
2007-04-22 Direction Drilling Operation Performed - Horizontal
2007-04-24 Intermediate Casing Operation Performed
2007-04-27 Finished Drilling
2007-04-27 Well Mode changed to Drilled and Cased
2007-04-28 Liner Casing Operation Performed
2007-04-28 Perforation Treatment Performed - Open-Hole Completion
2007-04-28 Perforation Treatment Performed - Slotted Liner or Casing
2007-04-28 Rig Released
2007-04-28 Well Log Performed
2007-08-17 Well Log Performed
2008-11-01 Well Began Production
2008-11-01 Well Fluid changed to Crude Bitumen
2008-11-01 Well Type changed to Cyclical
2011-10-31 Perforation Treatment Performed - Cement Plug
2011-11-02 Well Log Performed
2012-03-03 Well Log Performed
2012-03-08 Well Log Performed
2012-06-30 Well Fluid changed to Crude Bitumen
2012-06-30 Well Mode changed to Suspended
2012-06-30 Well Type changed to Cyclical
2012-11-01 Well Fluid changed to Crude Bitumen
2012-11-01 Well Type changed to Cyclical
2013-04-20 Perforation Treatment Performed - Open-Hole Completion
2013-04-20 Perforation Treatment Performed - Slotted Liner or Casing
2013-04-24 Production Casing Operation Performed
2016-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-09-21 Well Log Performed
2017-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-10-02 Perforation Treatment Performed - Jet Perforation
2017-10-02 Well Log Performed
2017-10-03 Perforation Treatment Performed - Jet Perforation
2017-10-04 Perforation Treatment Performed - Jet Perforation
2017-10-05 Perforation Treatment Performed - Jet Perforation
2018-04-11 Perforation Treatment Performed - Jet Perforation
2019-06-22 Well Log Performed
2019-09-18 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-04-22 250.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-04-28 Slotted Liner 799.00 1676.00 0
2017-10-02 Perforation 1640.10 1646.10 10
2017-10-03 Perforation 1401.80 1407.80 10
2017-10-03 Perforation 1428.30 1434.30 10
2017-10-03 Perforation 1454.80 1460.80 10
2017-10-03 Perforation 1481.50 1487.50 10
2017-10-03 Perforation 1507.90 1513.90 10
2017-10-03 Perforation 1534.00 1540.00 10
2017-10-03 Perforation 1560.10 1566.10 10
2017-10-04 Perforation 1109.80 1196.80 10
2017-10-04 Perforation 1217.30 1223.30 10
2007-04-28 Open Hole/Barefoot Completion 1676.00 1681.00 0
2017-10-04 Perforation 1243.60 1249.60 10
2017-10-04 Perforation 1269.90 1275.90 10
2017-10-04 Perforation 1296.10 1302.10 10
2017-10-04 Perforation 1322.40 1328.40 10
2017-10-04 Perforation 1348.80 1354.80 10
2017-10-04 Perforation 1361.30 1367.30 10
2017-10-05 Perforation 1111.30 1117.30 10
2017-10-05 Perforation 1137.60 1143.60 10
2017-10-05 Perforation 1164.10 1170.10 10
2018-04-11 Perforation 1084.80 1090.80 10
2011-10-31 Cement Plug 499.20 680.00 0
2018-04-11 Perforation 1071.70 1077.70 10
2018-04-11 Perforation 887.30 893.30 10
2018-04-11 Perforation 913.70 919.70 10
2018-04-11 Perforation 939.60 945.60 10
2018-04-11 Perforation 952.80 958.80 10
2018-04-11 Perforation 966.00 972.00 10
2018-04-11 Perforation 781.40 787.40 10
2018-04-11 Perforation 808.00 814.00 10
2018-04-11 Perforation 834.60 840.60 10
2018-04-11 Perforation 861.10 867.10 10
2013-04-20 Slotted Liner 799.00 1676.00 0
2013-04-20 Open Hole/Barefoot Completion 1676.00 1681.00 0
2016-06-11 Acid Treatment 799.00 1681.00 0
2017-06-02 Acid Treatment 799.00 1681.00 0
2017-10-02 Perforation 1586.70 1592.70 10
2017-10-02 Perforation 1613.40 1619.40 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 62 0.0 0.0 0.0
2009 7578 0.0 0.0 0.0
2010 5992 0.0 0.0 0.0
2011 5675 0.0 0.0 0.0
2012 4 0.0 0.0 0.0
2013 2662 0.0 0.0 0.0
2014 2335 0.0 0.0 0.0
2015 8220 0.0 0.0 0.0
2016 3444 0.0 0.0 0.0
2017 7656 0.0 0.0 0.0
2018 8038 0.0 0.0 0.0
2019 7927 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-15 No Incident Encountered 0.00 0.00
2013-05-03 No Incident Encountered 0.00 0.00
2016-06-14 No Incident Encountered 0.00 0.00
2017-06-07 No Incident Encountered 0.00 0.00
2017-10-06 No Incident Encountered 0.00 0.00
2018-04-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References