If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0674030104042 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.774953,"lon":-110.328751,"icon":""}]} |
Location: 04/04-01-067-03W4/2 | |
Location Alias: 04/04-01-67-03 W4M | |
Location Alias 2: 04/04-01-067-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 4 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CNRL 5A74 PRIMROSE 4-1-67-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0380833 | |
License Date: 2007-08-22 | |
License Status: Issued | |
Spud Date: 2008-02-11 | |
Final Drill Date: 2008-03-21 | |
Well Total Depth: 1690.00 m | |
Surface Hole Latitude: 54.774953 | |
Surface Hole Longitude: -110.328751 |
Date | Event |
---|---|
2007-08-22 | Obtained License |
2008-02-11 | Surface Casing Operation Performed |
2008-03-08 | Direction Drilling Operation Performed - Horizontal |
2008-03-09 | Intermediate Casing Operation Performed |
2008-03-21 | Direction Drilling Operation Performed - Horizontal |
2008-03-21 | Finished Drilling |
2008-03-21 | Well Mode changed to Drilled and Cased |
2008-03-22 | Liner Casing Operation Performed |
2008-03-22 | Perforation Treatment Performed - Open-Hole Completion |
2008-03-22 | Perforation Treatment Performed - Slotted Liner or Casing |
2008-03-22 | Rig Released |
2008-03-22 | Well Log Performed |
2009-02-07 | Well Log Performed |
2009-02-15 | Well Log Performed |
2009-11-01 | Well Began Production |
2009-11-01 | Well Fluid changed to Crude Bitumen |
2009-11-01 | Well Type changed to Cyclical |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-03-08 | 122.00 | Horizontal |
2008-03-21 | 851.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-03-22 | Slotted Liner | 817.00 | 1682.00 | 0 |
2008-03-22 | Open Hole/Barefoot Completion | 1682.00 | 1690.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 160 | 0.0 | 0.0 | 0.0 |
2010 | 5703 | 0.0 | 0.0 | 0.0 |
2011 | 6978 | 0.0 | 0.0 | 0.0 |
2012 | 6886 | 0.0 | 0.0 | 0.0 |
2013 | 4889 | 0.0 | 0.0 | 0.0 |
2014 | 7005 | 0.0 | 0.0 | 0.0 |
2015 | 8004 | 0.0 | 0.0 | 0.0 |
2016 | 5186 | 0.0 | 0.0 | 0.0 |
2017 | 7962 | 0.0 | 0.0 | 0.0 |
2018 | 8511 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 844 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-02-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]