X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674030102030

Well Details

Well ID: 0674030102030
Loading map...
Location: 03/02-01-067-03W4/0
Location Alias: 03/02-01-67-03 W4M
Location Alias 2: 03/02-01-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 01
County/Municipality: Improvement District No. 349
Well Name: CNRL 13A77 PRIMROSE 2-1-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0378163
License Date: 2007-06-14
License Status: Issued
Spud Date: 2007-07-07
Final Drill Date: 2007-09-02
Well Total Depth: 1726.00 m
Surface Hole Latitude: 54.774049
Surface Hole Longitude: -110.310368

For data sources see[1][2]

Well History

Date Event
2007-06-14 Obtained License
2007-07-07 Surface Casing Operation Performed
2007-07-12 Well Log Performed
2007-08-03 Direction Drilling Operation Performed - Horizontal
2007-08-05 Intermediate Casing Operation Performed
2007-08-05 Well Log Performed
2007-09-02 Finished Drilling
2007-09-02 Liner Casing Operation Performed
2007-09-02 Perforation Treatment Performed - Open-Hole Completion
2007-09-02 Perforation Treatment Performed - Slotted Liner or Casing
2007-09-02 Well Log Performed
2007-09-02 Well Mode changed to Drilled and Cased
2007-09-03 Rig Released
2008-01-03 Well Log Performed
2008-11-01 Well Began Production
2008-11-01 Well Fluid changed to Crude Bitumen
2008-11-01 Well Type changed to Cyclical
2009-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-27 Well Log Performed
2010-03-01 Well Fluid changed to Crude Bitumen
2010-03-01 Well Mode changed to Suspended
2010-03-01 Well Type changed to Cyclical
2010-05-28 Perforation Treatment Performed - Open-Hole Completion
2010-05-28 Perforation Treatment Performed - Slotted Liner or Casing
2010-06-01 Well Fluid changed to Crude Bitumen
2010-06-01 Well Type changed to Cyclical
2017-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-05-31 Well Log Performed
2017-06-01 Well Log Performed
2018-07-20 Perforation Treatment Performed - Jet Perforation
2018-07-21 Perforation Treatment Performed - Jet Perforation
2018-07-22 Perforation Treatment Performed - Jet Perforation
2018-07-23 Perforation Treatment Performed - Jet Perforation
2018-07-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-08-03 108.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-09-02 Slotted Liner 895.00 1721.00 0
2018-07-20 Perforation 1632.90 1638.90 10
2018-07-20 Perforation 1606.90 1612.90 10
2018-07-20 Perforation 1581.00 1587.00 10
2018-07-21 Perforation 1555.20 1561.20 10
2018-07-21 Perforation 1529.40 1535.40 10
2018-07-21 Perforation 1503.40 1509.40 10
2018-07-21 Perforation 1477.50 1483.50 10
2018-07-22 Perforation 1451.60 1457.60 10
2018-07-22 Perforation 1425.80 1431.80 10
2018-07-22 Perforation 1399.90 1405.90 10
2007-09-02 Open Hole/Barefoot Completion 1721.00 1726.00 0
2018-07-22 Perforation 1373.90 1379.90 10
2018-07-23 Perforation 1348.10 1354.10 10
2018-07-23 Perforation 1332.30 1338.30 10
2018-07-23 Perforation 1296.40 1302.40 10
2018-07-23 Perforation 1270.50 1276.50 10
2018-07-23 Perforation 1244.60 1250.60 10
2018-07-23 Perforation 1218.10 1224.10 10
2018-07-23 Perforation 1192.60 1198.60 10
2018-07-23 Perforation 1167.40 1173.40 10
2018-07-24 Perforation 1141.10 1147.10 10
2009-07-28 Packing Device Capped w/Cement 639.90 687.00 0
2018-07-24 Perforation 1114.70 1120.70 10
2018-07-24 Perforation 1088.30 1094.30 10
2018-07-24 Perforation 1061.70 1067.70 10
2018-07-24 Perforation 1034.90 1040.90 10
2018-07-24 Perforation 1009.10 1015.10 10
2018-07-24 Perforation 982.50 988.50 10
2018-07-24 Perforation 956.00 962.00 10
2018-07-24 Perforation 929.50 935.50 10
2018-07-24 Perforation 883.70 889.70 10
2010-05-28 Slotted Liner 895.00 1721.00 0
2010-05-28 Open Hole/Barefoot Completion 1721.00 1726.00 0
2017-05-30 Acid Treatment 895.00 1726.00 0
2018-07-20 Perforation 1698.00 1704.00 10
2018-07-20 Perforation 1685.00 1691.00 10
2018-07-20 Perforation 1658.80 1664.80 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 205 0.0 0.0 0.0
2009 4400 0.0 0.0 0.0
2010 2415 0.0 0.0 0.0
2011 6909 0.0 0.0 0.0
2012 6725 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8153 0.0 0.0 0.0
2015 7825 0.0 0.0 0.0
2016 5454 0.0 0.0 0.0
2017 7749 0.0 0.0 0.0
2018 8253 0.0 0.0 0.0
2019 8522 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-11 No Incident Encountered 0.00 0.00
2018-07-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References