X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666113609000

Well Details

Well ID: 0666113609000
Loading map...
Location: 00/09-36-066-11W6/0
Location Alias: 00/09-36-66-11 W6M
Location Alias 2: 00/09-36-066-11 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 11
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONG RUN WAPITI 9-36-66-11
Operator Name: Long Run Exploration Ltd.
License Number: 0218147
License Date: 1998-10-16
License Status: Issued
Spud Date: 1998-10-27
Final Drill Date: 1998-11-09
Well Total Depth: 2605.00 m
Surface Hole Latitude: 54.757422
Surface Hole Longitude: -119.516953

For data sources see[1][2]

Well History

Date Event
1998-10-16 Obtained License
1998-10-28 Surface Casing Operation Performed
1998-11-09 Finished Drilling
1998-11-09 Well Log Performed
1998-11-10 Drill Stem Test Performed
1998-11-12 Drill Stem Test Performed
1998-11-14 Production Casing Operation Performed
1998-11-14 Rig Released
1998-11-14 Well Log Performed
1998-11-14 Well Mode changed to Drilled and Cased
1998-11-23 Perforation Treatment Performed - Jet Perforation
2001-02-03 Perforation Treatment Performed - Fractured
2008-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-22 Plug Back Performed
2008-07-22 Well Log Performed
2008-07-22 Well Mode changed to Abandoned Zone
2008-07-23 Well Log Performed
2008-08-19 Perforation Treatment Performed - Jet Perforation
2008-08-29 Perforation Treatment Performed - Cement Squeeze
2008-09-02 Perforation Treatment Performed - Cement Squeeze
2008-09-06 Perforation Treatment Performed - Jet Perforation
2008-09-07 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-11-23 Perforation 2561.00 2566.00 17
2008-09-07 Fracture 976.00 982.00 0
2001-02-03 Fracture 2561.00 2566.00 0
2008-07-22 Packing Device Capped w/Cement 2544.00 2552.00 0
2008-08-19 Perforation 1050.00 1050.50 20
2008-08-19 Perforation 900.00 900.50 20
2008-08-29 Cement Squeeze 900.00 900.50 0
2008-09-02 Cement Squeeze 1050.00 1050.50 0
2008-09-06 Perforation 980.00 982.00 20
2008-09-06 Perforation 976.00 979.00 20

For data sources see[4]



References