X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666031014000

Well Details

Well ID: 0666031014000
Loading map...
Location: 00/14-10-066-03W6/0
Location Alias: 00/14-10-66-03 W6M
Location Alias 2: 00/14-10-066-03 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 03
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: MANCAL HZ KARR 14-10-66-3
Operator Name: Mancal Energy Inc.
License Number: 0467467
License Date: 2014-06-18
License Status: Issued
Spud Date: 2014-09-06
Final Drill Date: 2014-09-25
Well Total Depth: 3407.00 m
Surface Hole Latitude: 54.688181
Surface Hole Longitude: -118.373646

For data sources see[1][2]

Well History

Date Event
2014-06-18 Obtained License
2014-09-14 Surface Casing Operation Performed
2014-09-17 Direction Drilling Operation Performed - Deviate
2014-09-19 Direction Drilling Operation Performed - Horizontal
2014-09-25 Finished Drilling
2014-09-25 Well Log Performed
2014-09-25 Well Mode changed to Drilled and Cased
2014-09-27 Liner Casing Operation Performed
2014-09-27 Production Casing Operation Performed
2014-09-29 Rig Released
2014-11-14 Well Log Performed
2014-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-17 Perforation Treatment Performed - Open-Hole Completion
2014-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-20 Well Fluid changed to Crude Oil
2014-11-20 Well Mode changed to Drilling and Completing
2014-11-22 Well Log Performed
2014-12-01 Well Began Production
2014-12-01 Well Fluid changed to Crude Oil
2014-12-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-06 Savanna Drilling Corp. 622 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-17 1387.60 Deviate (5 - 79 degrees)
2014-09-19 1779.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-17 Open Hole/Barefoot Completion 3405.00 3407.00 0
2014-11-18 Multi-Stage Fracture 2669.70 2670.40 0
2014-11-18 Multi-Stage Fracture 2585.50 2586.20 0
2014-11-18 Multi-Stage Fracture 2500.80 2501.50 0
2014-11-19 Multi-Stage Fracture 2404.40 2405.00 0
2014-11-19 Multi-Stage Fracture 2321.40 2322.10 0
2014-11-19 Multi-Stage Fracture 2238.50 2239.20 0
2014-11-19 Multi-Stage Fracture 2142.00 2142.70 0
2014-11-19 Multi-Stage Fracture 2059.10 2059.70 0
2014-11-17 Multi-Stage Fracture 3372.80 3373.40 0
2014-11-17 Multi-Stage Fracture 3275.00 3275.70 0
2014-11-17 Multi-Stage Fracture 3190.50 3191.20 0
2014-11-18 Multi-Stage Fracture 3105.80 3106.50 0
2014-11-18 Multi-Stage Fracture 3034.60 3035.30 0
2014-11-18 Multi-Stage Fracture 2937.50 2938.20 0
2014-11-18 Multi-Stage Fracture 2839.20 2839.90 0
2014-11-18 Multi-Stage Fracture 2754.50 2755.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-17 2014-11-19 1,673 696 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 40.6456 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 22.398 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.9368 N/A
SB EXCEL 20/40 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 4.6787 N/A
AcTivator Baker Hughes Activator Alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.0228 N/A
Methanol 67-56-1 100 0.0228 N/A
Polyethylene glycol 25322-68-3 100 0.0228 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0538 N/A
Methanol 67-56-1 100 0.0538 N/A
Water 7732-18-5 100 0.0538 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0102 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 30.8277 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.2313 N/A
Oxyalkylated alcohol 9014 100 0.2313 N/A
Petroleum distillates 64742-47-8 100 0.2313 N/A
Polyacrylate 9014 100 0.2313 N/A
FAW-26 Baker Hughes Surfactant 1-Butoxy-2-propanol 5131-66-8 100 0.1947 N/A
Diethanolamine 111-42-2 100 0.1947 N/A
Ethanol 64-17-5 100 0.1947 N/A
Methanol 67-56-1 100 0.1947 N/A
Polyoxyalkylene sulfate 68891-29-2 100 0.1947 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-12 2014-11-18 Municipal Water 807

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 744 0.0 0.0 0.0
2015 4243 0.0 0.0 0.0
2016 5575 0.0 0.0 0.0
2017 8578 0.0 0.0 0.0
2018 7656 0.0 0.0 0.0
2019 8276 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-29 No Incident Encountered 0.00 0.00
2014-12-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References