X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665252510000

Well Details

Well ID: 0665252510000
Loading map...
Location: 00/10-25-066-25W5/0
Location Alias: 00/10-25-66-25 W5M
Location Alias 2: 00/10-25-066-25 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 25
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTE 10-25-66-25
Operator Name: ARC Resources Ltd.
License Number: 0420145
License Date: 2010-04-28
License Status: Issued
Spud Date: 2010-06-18
Final Drill Date: 2010-06-29
Well Total Depth: 3020.00 m
Surface Hole Latitude: 54.732522
Surface Hole Longitude: -117.648544

For data sources see[1][2]

Well History

Date Event
2010-04-28 Obtained License
2010-06-20 Surface Casing Operation Performed
2010-06-22 Direction Drilling Operation Performed - Horizontal
2010-06-24 Well Log Performed
2010-06-26 Intermediate Casing Operation Performed
2010-06-29 Finished Drilling
2010-06-29 Well Log Performed
2010-06-29 Well Mode changed to Drilled and Cased
2010-07-01 Liner Casing Operation Performed
2010-07-01 Rig Released
2010-07-12 Well Log Performed
2010-07-15 Perforation Treatment Performed - Open-Hole Completion
2010-07-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-22 Perforation Treatment Performed - Open-Hole Completion
2010-10-04 Well Began Production
2010-10-04 Well Fluid changed to Crude Oil
2010-10-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-06-22 1613.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-15 Open Hole/Barefoot Completion 2167.00 3020.00 0
2010-07-22 Open Hole/Barefoot Completion 2167.00 3020.00 0
2010-07-22 Multi-Stage Fracture 2943.10 2943.20 0
2010-07-22 Multi-Stage Fracture 2796.70 2796.80 0
2010-07-22 Multi-Stage Fracture 2663.30 2663.40 0
2010-07-22 Multi-Stage Fracture 2529.60 2529.70 0
2010-07-22 Multi-Stage Fracture 2384.70 2384.80 0
2010-07-22 Multi-Stage Fracture 2251.10 2251.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2108 0.0 0.0 0.0
2011 6313 0.0 0.0 0.0
2012 8063 0.0 0.0 0.0
2013 7945 0.0 0.0 0.0
2014 7945 0.0 0.0 0.0
2015 7117 0.0 0.0 0.0
2016 8755 0.0 0.0 0.0
2017 7027 0.0 0.0 0.0
2018 7284 0.0 0.0 0.0
2019 3540 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References