X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665252207020

Well Details

Well ID: 0665252207020
Loading map...
Location: 02/07-22-066-25W5/0
Location Alias: 02/07-22-66-25 W5M
Location Alias 2: 02/07-22-066-25 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 25
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ 102 ANTEN 7-22-66-25
Operator Name: ARC Resources Ltd.
License Number: 0477456
License Date: 2015-11-05
License Status: Amended
Spud Date: 2017-01-27
Final Drill Date: 2017-02-08
Well Total Depth: 4370.00 m
Surface Hole Latitude: 54.714616
Surface Hole Longitude: -117.662327

For data sources see[1][2]

Well History

Date Event
2015-11-05 Obtained License
2017-01-28 Surface Casing Operation Performed
2017-01-31 Direction Drilling Operation Performed - Deviate
2017-02-03 Direction Drilling Operation Performed - Horizontal
2017-02-08 Finished Drilling
2017-02-08 Well Log Performed
2017-02-08 Well Mode changed to Drilled and Cased
2017-02-09 Production Casing Operation Performed
2017-02-10 Rig Released
2017-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-14 Well Began Production
2017-03-14 Well Fluid changed to Crude Oil
2017-03-14 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-31 1745.20 Deviate (5 - 79 degrees)
2017-02-03 2109.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-06 Multi-Stage Fracture 4308.60 4310.60 0
2017-03-07 Multi-Stage Fracture 3706.40 3708.30 0
2017-03-08 Multi-Stage Fracture 3622.10 3624.00 0
2017-03-08 Multi-Stage Fracture 3552.70 3554.60 0
2017-03-08 Multi-Stage Fracture 3480.80 3482.80 0
2017-03-08 Multi-Stage Fracture 3410.70 3412.60 0
2017-03-08 Multi-Stage Fracture 3339.20 3341.20 0
2017-03-08 Multi-Stage Fracture 3268.30 3270.30 0
2017-03-08 Multi-Stage Fracture 3197.10 3199.10 0
2017-03-08 Multi-Stage Fracture 3126.20 3128.20 0
2017-03-08 Multi-Stage Fracture 3057.00 3058.90 0
2017-03-07 Multi-Stage Fracture 4276.70 4278.70 0
2017-03-08 Multi-Stage Fracture 2971.00 2972.90 0
2017-03-08 Multi-Stage Fracture 2899.10 2901.10 0
2017-03-08 Multi-Stage Fracture 2827.60 2829.60 0
2017-03-08 Multi-Stage Fracture 2759.10 2761.00 0
2017-03-08 Multi-Stage Fracture 2688.90 2690.80 0
2017-03-08 Multi-Stage Fracture 2604.40 2606.40 0
2017-03-08 Multi-Stage Fracture 2548.90 2550.10 0
2017-03-09 Multi-Stage Fracture 2475.90 2477.90 0
2017-03-09 Multi-Stage Fracture 2403.80 2405.70 0
2017-03-07 Multi-Stage Fracture 4204.10 4206.00 0
2017-03-07 Multi-Stage Fracture 4134.80 4136.80 0
2017-03-07 Multi-Stage Fracture 4063.40 4065.30 0
2017-03-07 Multi-Stage Fracture 3994.20 3996.10 0
2017-03-07 Multi-Stage Fracture 3923.00 3924.90 0
2017-03-07 Multi-Stage Fracture 3850.30 3852.20 0
2017-03-07 Multi-Stage Fracture 3778.30 3780.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-06 2017-03-09 2,021 2,208 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 32.6267 N/A
Water Not Available 100 50.3268 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 16.1385 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.4548 N/A
Water 7732-18-5 100 0.4548 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.008 N/A
Methyl Alcohol 67-56-1 100 0.0081 N/A
Non-Hazardous Ingredients Not Available 100 0.0081 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.008 N/A
SBL-2 (Buffer) Step Energy Services Buffer Acetic Acid 64-19-7 100 0.0399 N/A
Non-Hazardous Ingredients Not Available 100 0.0399 N/A
SCI-4 (Corrosion Inhibitor) Step Energy Services Corrosion Inhibitor Methanol 67-56-1 100 0.0008 N/A
Modified Thiourea Polymer 68527-49-1 100 0.0008 N/A
Olefin 64743-02-8 100 0.0008 N/A
Polyoxyalkylenes 68951-67-7 100 0.0008 N/A
Propargyl Alcohol 107-19-7 100 0.0008 N/A
SNE-3 (Non-Emulsifier) Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0395 N/A
Methyl Alcohol 67-56-1 100 0.0395 N/A
Non-Hazardous Ingredients Not Available 100 0.0395 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.0395 N/A
SWF-1 (Foamer) Step Energy Services Foamer 1-Dodecanesulfonic acid. hydroxy-. sodium salt 128824-30-6 100 0.0752 N/A
Dodecene-1-sulfonic acid. sodium salt 30965-85-6 100 0.0752 N/A
Non-Hazardous Ingredients Not Available 100 0.0752 N/A
Sodium Hydroxide 1310-73-2 100 0.0752 N/A
SML-7 (Metal to Metal Lubricant) Step Energy Services Friction Reducer Non-Hazardous Ingredients Not Available 100 0.0236 N/A
SWG-201L (Gellant) Step Energy Services Gelling Agent Non-Hazardous Ingredients Not Available 100 0.2545 N/A
SIC-3 (Iron Chelator) Step Energy Services Iron Control Citric Acid 77-92-9 100 0.0022 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5941 0.0 0.0 0.0
2018 8179 0.0 0.0 0.0
2019 8326 0.0 0.0 0.0
2020 1704 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-10 No Incident Encountered 0.00 0.00
2017-03-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References