X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665252202000

Well Details

Well ID: 0665252202000
Loading map...
Location: 00/02-22-066-25W5/0
Location Alias: 00/02-22-66-25 W5M
Location Alias 2: 00/02-22-066-25 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 25
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC RES ANTE 2-22-66-25
Operator Name: ARC Resources Ltd.
License Number: 0047145
License Date: 1973-09-05
License Status: Issued
Spud Date: 1973-09-05
Final Drill Date: 1973-10-15
Well Total Depth: 3427.50 m
Surface Hole Latitude: 54.722676
Surface Hole Longitude: -117.688684

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-09-05 Obtained License
1973-09-15 Drill Stem Test Performed
1973-10-15 Finished Drilling
1973-10-15 Well Log Performed
1973-10-15 Well Mode changed to Drilled and Cased
1973-10-19 Production Casing Operation Performed
1973-11-20 Well Log Performed
1973-11-21 Perforation Treatment Performed - Jet Perforation
1973-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-26 Well Began Production
1973-11-26 Well Fluid changed to Crude Oil
1973-11-26 Well Mode changed to Flowing
1978-11-13 Well Fluid changed to Crude Oil
1978-11-13 Well Mode changed to Pumping
1989-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-16 Perforation Treatment Performed - Jet Perforation
1989-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-11-21 Perforation 3366.20 3370.80 7
1973-11-24 Acid Treatment 3366.20 3370.80 0
1989-11-16 Acid Treatment 3366.20 3370.80 0
1989-11-16 Perforation 3343.90 3345.70 13
1989-11-16 Perforation 3348.80 3352.30 13
1989-11-17 Acid Treatment 3343.90 3352.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 566 0.0 0.0 0.0
1974 2758 0.0 0.0 0.0
1975 1914 0.0 0.0 0.0
1976 2376 0.0 0.0 0.0
1977 3530 0.0 0.0 0.0
1978 2475 0.0 0.0 0.0
1979 4655 0.0 0.0 0.0
1980 7026 0.0 0.0 0.0
1981 7696 0.0 0.0 0.0
1982 7942 0.0 0.0 0.0
1983 6341 0.0 0.0 0.0
1984 7761 0.0 0.0 0.0
1985 3685 0.0 0.0 0.0
1986 2879 0.0 0.0 0.0
1987 3273 0.0 0.0 0.0
1988 5381 0.0 0.0 0.0
1989 6436 0.0 0.0 0.0
1990 7584 0.0 0.0 0.0
1991 7098 0.0 0.0 0.0
1992 5866 0.0 0.0 0.0
1993 6766 0.0 0.0 0.0
1994 7004 0.0 0.0 0.0
1995 6872 0.0 0.0 0.0
1996 7357 0.0 0.0 0.0
1997 6948 0.0 0.0 0.0
1998 5921 0.0 0.0 0.0
1999 8304 0.0 0.0 0.0
2000 8640 0.0 0.0 0.0
2001 8308 0.0 0.0 0.0
2002 8115 0.0 0.0 0.0
2003 7913 0.0 0.0 0.0
2004 8611 0.0 0.0 0.0
2005 7543 0.0 0.0 0.0
2006 6119 0.0 0.0 0.0
2007 6965 0.0 0.0 0.0
2008 8114 0.0 0.0 0.0
2009 7175 0.0 0.0 0.0
2010 8119 0.0 0.0 0.0
2011 7709 0.0 0.0 0.0
2012 8598 0.0 0.0 0.0
2013 7752 0.0 0.0 0.0
2014 7708 0.0 0.0 0.0
2015 8050 0.0 0.0 0.0
2016 8464 0.0 0.0 0.0
2017 8177 0.0 0.0 0.0
2018 5095 0.0 0.0 0.0
2019 8701 0.0 0.0 0.0
2020 2027 0.0 0.0 0.0

For data sources see[5]

References