X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665251005020

Well Details

Well ID: 0665251005020
Loading map...
Location: 02/05-10-066-25W5/0
Location Alias: 02/05-10-66-25 W5M
Location Alias 2: 02/05-10-066-25 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 25
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC ANTE 5-10-66-25
Operator Name: ARC Resources Ltd.
License Number: 0392552
License Date: 2008-01-21
License Status: Suspension
Spud Date: 2008-02-20
Final Drill Date: 2008-03-11
Well Total Depth: 3471.00 m
Surface Hole Latitude: 54.696236
Surface Hole Longitude: -117.683386

For data sources see[1][2]

Well History

Date Event
2008-01-21 Obtained License
2008-02-24 Surface Casing Operation Performed
2008-02-28 Direction Drilling Operation Performed - Horizontal
2008-03-04 Intermediate Casing Operation Performed
2008-03-11 Finished Drilling
2008-03-11 Well Mode changed to Drilled and Cased
2008-03-13 Liner Casing Operation Performed
2008-03-14 Rig Released
2008-03-19 Well Log Performed
2008-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2008-09-02 Perforation Treatment Performed - Open-Hole Completion
2008-09-05 Well Began Production
2008-09-05 Well Fluid changed to Crude Oil
2008-09-05 Well Mode changed to Flowing
2020-04-01 Well Fluid changed to Crude Oil
2020-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-28 1846.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-02 Open Hole/Barefoot Completion 2168.00 3471.00 0
2008-09-02 Multi-Stage Fracture 3358.00 3358.10 0
2008-09-02 Multi-Stage Fracture 3212.00 3212.10 0
2008-09-02 Multi-Stage Fracture 3052.00 3052.10 0
2008-09-02 Multi-Stage Fracture 2852.00 2852.10 0
2008-09-02 Multi-Stage Fracture 2734.00 2734.10 0
2008-09-02 Multi-Stage Fracture 2520.00 2520.10 0
2008-09-02 Multi-Stage Fracture 2362.00 2362.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2574 0.0 0.0 0.0
2009 8223 0.0 0.0 0.0
2010 7052 0.0 0.0 0.0
2011 7614 0.0 0.0 0.0
2012 7168 0.0 0.0 0.0
2013 7190 0.0 0.0 0.0
2014 6671 0.0 0.0 0.0
2015 5856 0.0 0.0 0.0
2016 6084 0.0 0.0 0.0
2017 4418 0.0 0.0 0.0
2018 4767 0.0 0.0 0.0
2019 2828 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-09-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References