X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665243612020

Well Details

Well ID: 0665243612020
Loading map...
Location: 02/12-36-066-24W5/0
Location Alias: 02/12-36-66-24 W5M
Location Alias 2: 02/12-36-066-24 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 24
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: ENERPLUS CORP 02HZ ANTEN 12-36-66-24
Operator Name: Enerplus Corporation
License Number: 0467013
License Date: 2014-06-02
License Status: Issued
Spud Date: 2014-06-11
Final Drill Date: 2014-06-22
Well Total Depth: 3605.00 m
Surface Hole Latitude: 54.758359
Surface Hole Longitude: -117.476654

For data sources see[1][2]

Well History

Date Event
2014-06-02 Obtained License
2014-06-14 Surface Casing Operation Performed
2014-06-15 Direction Drilling Operation Performed - Deviate
2014-06-17 Direction Drilling Operation Performed - Horizontal
2014-06-18 Well Log Performed
2014-06-19 Intermediate Casing Operation Performed
2014-06-22 Finished Drilling
2014-06-22 Well Log Performed
2014-06-22 Well Mode changed to Drilled and Cased
2014-06-24 Liner Casing Operation Performed
2014-06-25 Rig Released
2014-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-29 Perforation Treatment Performed - Open-Hole Completion
2014-07-07 Well Began Production
2014-07-07 Well Fluid changed to Crude Oil
2014-07-07 Well Mode changed to Flowing
2018-02-01 Well Fluid changed to Crude Oil
2018-02-01 Well Mode changed to Suspended
2018-02-08 Well Log Performed
2018-02-10 Well Log Performed
2018-07-20 Well Began Injection
2018-07-20 Well Fluid changed to Water
2018-07-20 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-06-11 Excalibur Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-06-15 1595.00 Deviate (5 - 79 degrees)
2014-06-17 2086.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-06-29 Open Hole/Barefoot Completion 3559.10 3605.00 0
2014-06-29 Multi-Stage Fracture 3025.00 3025.10 0
2014-06-29 Multi-Stage Fracture 2980.10 2980.20 0
2014-06-29 Multi-Stage Fracture 2895.30 2895.40 0
2014-06-29 Multi-Stage Fracture 2823.80 2823.90 0
2014-06-29 Multi-Stage Fracture 2765.60 2765.70 0
2014-06-29 Multi-Stage Fracture 2707.50 2707.60 0
2014-06-29 Multi-Stage Fracture 2636.00 2636.10 0
2014-06-29 Multi-Stage Fracture 2577.80 2577.90 0
2014-06-29 Multi-Stage Fracture 2506.10 2506.20 0
2014-06-29 Multi-Stage Fracture 2447.90 2448.00 0
2014-06-29 Multi-Stage Fracture 3537.50 3537.60 0
2014-06-29 Multi-Stage Fracture 2389.70 2389.80 0
2014-06-29 Multi-Stage Fracture 2318.30 2318.40 0
2014-06-29 Multi-Stage Fracture 2260.10 2260.20 0
2014-06-29 Multi-Stage Fracture 3472.50 3472.60 0
2014-06-29 Multi-Stage Fracture 3400.90 3401.00 0
2014-06-29 Multi-Stage Fracture 3342.70 3342.80 0
2014-06-29 Multi-Stage Fracture 3271.00 3271.10 0
2014-06-29 Multi-Stage Fracture 3212.80 3212.90 0
2014-06-29 Multi-Stage Fracture 3154.60 3154.70 0
2014-06-29 Multi-Stage Fracture 3083.10 3083.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-29 2014-06-29 1,963 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Oil 64742-81-0 100 58.5196 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 32.3294 N/A
DHP-202 Calfrac Activator Non-Hazardous Ingredients Trade Secret 100 0.4939 N/A
Sulfuric acid 7664-93-9 100 0.5198 N/A
Sulfuric acid. iron(2+) salt (1:?) 16547-58-3 100 0.4939 N/A
DHP-903 Calfrac Breaker 1-Hexanol. 2-ethyl- 104-76-7 100 0.3214 N/A
Ethanol. 2.2'-iminobis- 111-42-2 100 0.3472 N/A
Fatty Amine #1 8842 100 0.3047 N/A
Fatty Amine #2 8842 100 0.3047 N/A
Magnesium oxide (MgO) 1309-48-4 100 0.3073 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3056 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 9.3467 N/A
DHP-201 Calfrac Gelling Agent 1-Decanol 112-30-1 100 0.6349 N/A
1-Octanol 111-87-5 100 0.6349 N/A
Phosphoric acid. mixed decyl and Et and octyl esters 68412-60-2 100 0.5989 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3870 0.0 0.0 0.0
2015 8540 0.0 0.0 0.0
2016 8584 0.0 0.0 0.0
2017 2144 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-25 No Incident Encountered 0.00 0.00
2014-07-15 No Incident Encountered 0.00 0.00
2018-02-12 No Incident Encountered 0.00 0.00

For data sources see[9]

References