X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665242501020

Well Details

Well ID: 0665242501020
Loading map...
Location: 02/01-25-066-24W5/0
Location Alias: 02/01-25-66-24 W5M
Location Alias 2: 02/01-25-066-24 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 24
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: ENERPLUS CORP 102HZ ANTEN 1-25-66-24
Operator Name: Enerplus Corporation
License Number: 0467505
License Date: 2014-06-19
License Status: Issued
Spud Date: 2014-06-25
Final Drill Date: 2014-07-10
Well Total Depth: 3589.00 m
Surface Hole Latitude: 54.739133
Surface Hole Longitude: -117.508355

For data sources see[1][2]

Well History

Date Event
2014-06-19 Obtained License
2014-06-27 Surface Casing Operation Performed
2014-06-28 Direction Drilling Operation Performed - Deviate
2014-07-01 Direction Drilling Operation Performed - Horizontal
2014-07-02 Well Log Performed
2014-07-03 Intermediate Casing Operation Performed
2014-07-10 Finished Drilling
2014-07-10 Well Log Performed
2014-07-10 Well Mode changed to Drilled and Cased
2014-07-11 Well Log Performed
2014-07-13 Liner Casing Operation Performed
2014-07-14 Rig Released
2014-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-18 Perforation Treatment Performed - Open-Hole Completion
2014-07-28 Well Began Production
2014-07-28 Well Fluid changed to Crude Oil
2014-07-28 Well Mode changed to Pumping
2018-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-17 Plug Back Performed
2018-12-17 Well Fluid changed to Crude Oil
2018-12-17 Well Mode changed to Abandoned Zone
2018-12-19 Well Log Performed
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-12 Well Log Performed
2020-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-25 Perforation Treatment Performed - Jet Perforation
2020-02-25 Plug Back Performed
2020-02-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-06-25 Excalibur Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-06-28 750.00 Deviate (5 - 79 degrees)
2014-07-01 2090.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-07-18 Open Hole/Barefoot Completion 3584.00 3589.00 0
2014-07-18 Multi-Stage Fracture 3052.30 3052.40 0
2014-07-18 Multi-Stage Fracture 2980.90 2981.00 0
2014-07-18 Multi-Stage Fracture 2922.70 2922.80 0
2014-07-18 Multi-Stage Fracture 2864.90 2865.00 0
2014-07-18 Multi-Stage Fracture 2793.50 2793.60 0
2014-07-18 Multi-Stage Fracture 2735.30 2735.40 0
2014-07-18 Multi-Stage Fracture 2663.80 2663.90 0
2014-07-18 Multi-Stage Fracture 2619.10 2619.20 0
2014-07-18 Multi-Stage Fracture 2547.50 2547.60 0
2014-07-18 Multi-Stage Fracture 2475.50 2475.60 0
2014-07-18 Multi-Stage Fracture 3562.40 3562.50 0
2014-07-18 Multi-Stage Fracture 2391.00 2391.10 0
2014-07-18 Multi-Stage Fracture 2332.80 2332.90 0
2014-07-18 Multi-Stage Fracture 2274.60 2274.70 0
2014-07-18 Multi-Stage Fracture 2216.30 2216.40 0
2014-07-18 Multi-Stage Fracture 2158.10 2158.20 0
2018-12-17 Packing Device Capped w/Cement 2010.00 2061.20 0
2019-01-12 Perforation 1969.00 1975.00 20
2019-01-12 Perforation 1964.00 1969.00 20
2020-02-25 Packing Device Capped w/Cement 1940.00 1953.00 0
2020-02-25 Perforation 739.50 750.50 17
2014-07-18 Multi-Stage Fracture 3497.50 3497.60 0
2020-02-26 Perforation 713.50 724.00 17
2020-02-26 Perforation 647.00 655.00 17
2014-07-18 Multi-Stage Fracture 3426.00 3426.10 0
2014-07-18 Multi-Stage Fracture 3368.50 3368.60 0
2014-07-18 Multi-Stage Fracture 3297.70 3297.80 0
2014-07-18 Multi-Stage Fracture 3239.60 3239.70 0
2014-07-18 Multi-Stage Fracture 3181.80 3181.90 0
2014-07-18 Multi-Stage Fracture 3110.40 3110.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-07-18 2014-07-18 1,975 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Oil 64742-81-0 100 69.0747 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 20.9877 N/A
DHP-202 Calfrac Activator Non-Hazardous Ingredients Trade Secret 100 0.5864 N/A
Sulfuric acid 7664-93-9 100 0.6175 N/A
Sulfuric acid. iron(2+) salt (1:?) 16547-58-3 100 0.5864 N/A
DHP-903 Calfrac Breaker 1-Hexanol. 2-ethyl- 104-76-7 100 0.3706 N/A
Ethanol. 2.2'-iminobis- 111-42-2 100 0.3889 N/A
Fatty Amine #1 8842 100 0.3601 N/A
Fatty Amine #2 8842 100 0.3601 N/A
Magnesium oxide (MgO) 1309-48-4 100 0.3639 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3615 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 9.9865 N/A
DHP-201 Calfrac Gelling Agent 1-Decanol 112-30-1 100 0.735 N/A
1-Octanol 111-87-5 100 0.735 N/A
Phosphoric acid. mixed decyl and Et and octyl esters 68412-60-2 100 0.7081 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3273 0.0 0.0 0.0
2015 8204 0.0 0.0 0.0
2016 8331 0.0 0.0 0.0
2017 1881 0.0 0.0 0.0
2018 647 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-14 No Incident Encountered 0.00 0.00
2014-08-07 No Incident Encountered 0.00 0.00
2019-02-01 No Incident Encountered 0.00 0.00
2020-03-01 No Incident Encountered 0.00 0.00

For data sources see[9]

References