If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0665242501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.739312,"lon":-117.508355,"icon":""}]} |
Location: 00/01-25-066-24W5/0 | |
Location Alias: 00/01-25-66-24 W5M | |
Location Alias 2: 00/01-25-066-24 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 5 | |
Range: 24 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ENERPLUS CORP HZ ANTEN 1-25-66-24 | |
Operator Name: Enerplus Corporation | |
License Number: 0459319 | |
License Date: 2013-09-13 | |
License Status: Issued | |
Spud Date: 2013-10-22 | |
Final Drill Date: 2013-10-31 | |
Well Total Depth: 3596.00 m | |
Surface Hole Latitude: 54.739312 | |
Surface Hole Longitude: -117.508355 |
Date | Event |
---|---|
2013-09-13 | Obtained License |
2013-10-23 | Surface Casing Operation Performed |
2013-10-24 | Direction Drilling Operation Performed - Deviate |
2013-10-27 | Direction Drilling Operation Performed - Horizontal |
2013-10-28 | Intermediate Casing Operation Performed |
2013-10-31 | Finished Drilling |
2013-10-31 | Well Log Performed |
2013-10-31 | Well Mode changed to Drilled and Cased |
2013-11-01 | Well Log Performed |
2013-11-04 | Liner Casing Operation Performed |
2013-11-05 | Rig Released |
2013-11-10 | Well Log Performed |
2013-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-12 | Perforation Treatment Performed - Open-Hole Completion |
2013-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-21 | Well Began Production |
2013-11-21 | Well Fluid changed to Crude Oil |
2013-11-21 | Well Mode changed to Flowing |
2014-03-17 | Well Fluid changed to Crude Oil |
2014-03-17 | Well Mode changed to Gas Lift |
2019-11-14 | Well Fluid changed to Crude Oil |
2019-11-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-10-22 | Beaver Drilling Ltd. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-10-24 | 778.00 | Deviate (5 - 79 degrees) |
2013-10-27 | 2090.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-11-12 | Open Hole/Barefoot Completion | 3591.00 | 3596.00 | 0 |
2013-11-13 | Multi-Stage Fracture | 3048.80 | 3048.90 | 0 |
2013-11-13 | Multi-Stage Fracture | 2991.50 | 2991.60 | 0 |
2013-11-13 | Multi-Stage Fracture | 2921.80 | 2921.90 | 0 |
2013-11-13 | Multi-Stage Fracture | 2853.30 | 2853.40 | 0 |
2013-11-13 | Multi-Stage Fracture | 2795.20 | 2795.30 | 0 |
2013-11-13 | Multi-Stage Fracture | 2727.70 | 2727.80 | 0 |
2013-11-13 | Multi-Stage Fracture | 2662.60 | 2662.70 | 0 |
2013-11-13 | Multi-Stage Fracture | 2606.80 | 2606.90 | 0 |
2013-11-13 | Multi-Stage Fracture | 2537.70 | 2537.80 | 0 |
2013-11-13 | Multi-Stage Fracture | 2467.60 | 2467.70 | 0 |
2013-11-12 | Multi-Stage Fracture | 3569.10 | 3569.20 | 0 |
2013-11-13 | Multi-Stage Fracture | 2413.10 | 2413.20 | 0 |
2013-11-13 | Multi-Stage Fracture | 2346.60 | 2346.70 | 0 |
2013-11-13 | Multi-Stage Fracture | 2277.50 | 2277.60 | 0 |
2013-11-13 | Multi-Stage Fracture | 2220.90 | 2221.00 | 0 |
2013-11-13 | Multi-Stage Fracture | 2150.30 | 2150.40 | 0 |
2013-11-12 | Multi-Stage Fracture | 3493.70 | 3493.80 | 0 |
2013-11-12 | Multi-Stage Fracture | 3437.40 | 3437.50 | 0 |
2013-11-12 | Multi-Stage Fracture | 3366.50 | 3366.60 | 0 |
2013-11-12 | Multi-Stage Fracture | 3309.20 | 3309.30 | 0 |
2013-11-13 | Multi-Stage Fracture | 3242.40 | 3242.50 | 0 |
2013-11-13 | Multi-Stage Fracture | 3172.90 | 3173.00 | 0 |
2013-11-13 | Multi-Stage Fracture | 3118.40 | 3118.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-11-12 | 2013-11-13 | 1,958 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Oil | 64742-81-0 | 100 | 62.9601 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 28.4592 | N/A | ||
DHP-202 | Calfrac | Activator | Non-Hazardous Ingredients | Trade Secret | 100 | 0.5341 | N/A | |
Sulfuric acid | 7664-93-9 | 100 | 0.5725 | N/A | ||||
Sulfuric acid. iron(2+) salt (1:?) | 16547-58-3 | 100 | 0.5341 | N/A | ||||
DHP-903 | Calfrac | Breaker | 1-Hexanol. 2-ethyl- | 104-76-7 | 100 | 0.2898 | N/A | |
Ethanol. 2.2'-iminobis- | 111-42-2 | 100 | 0.3105 | N/A | ||||
Fatty Amine #1 | 8842 | 100 | 0.2745 | N/A | ||||
Fatty Amine #2 | 8842 | 100 | 0.2745 | N/A | ||||
Magnesium oxide (MgO) | 1309-48-4 | 100 | 0.2767 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.2752 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 7.2245 | N/A | |
DHP-201 | Calfrac | Gelling Agent | 1-Decanol | 112-30-1 | 100 | 0.5804 | N/A | |
1-Octanol | 111-87-5 | 100 | 0.5804 | N/A | ||||
Phosphoric acid. mixed decyl and Et and octyl esters | 68412-60-2 | 100 | 0.552 | N/A |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 384 | 0.0 | 0.0 | 0.0 |
2014 | 7008 | 0.0 | 0.0 | 0.0 |
2015 | 7435 | 0.0 | 0.0 | 0.0 |
2016 | 8625 | 0.0 | 0.0 | 0.0 |
2017 | 8725 | 0.0 | 0.0 | 0.0 |
2018 | 8144 | 0.0 | 0.0 | 0.0 |
2019 | 7625 | 0.0 | 0.0 | 0.0 |
2020 | 978 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-11-05 | No Incident Encountered | 0.00 | 0.00 |
2013-11-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]